Similar Projects
Orangewood Boulevard and Gateway Avenue Intersection Improvements
Infrastructure
Bidding
$3,910,270 est. value
Orlando, FL 32821

Utilities Operation Center East (UOC-East) and Eastern Water Reclamation Roadway Improvements
Infrastructure
Bidding
$41,382,000 est. value
Orlando, FL 32825

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Fuel Island Drain Installation
Results
Orlando, FL 32801

Shingle Creek Regional Trail Phase 2 (from Town Loop Boulevard to Taft-Vineland Road at Central Florida Parkway) FPID: 439878-58-01 FAN: D519-015-B
Results
$5,401,637 est. value
FL

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SheltAir FBO Parking Lot Expansion
Addition
Construction
Orlando, FL 32803

Parks Cady Way Trail Drainage Improvements
Infrastructure
Bidding
$58,000 est. value
Winter Park, FL 32792

Request for Qualifications for Construction Services
New Construction
Post-Bid
Orlando, FL 32811

S.R. 538 Poinciana Parkway Widening from Ronald Reagan Parkway to Cypress Parkway
Results
Orlando, FL 32807

Cold In-Place Bituminous Base Recycling with Asphalt Resurfacing
Term Contract
Bidding
$13,057,755 est. value
Orlando, FL

Underdrains Installation and Repairs
Post-Bid
Less than $6,771,550 est. value
FL

Packing District Roadway Improvements
Results
Less than $16,000,000 est. value
Orlando, FL 32802

SR 429 Widening from Tilden Road to Florida's Turnpike
Infrastructure
Bidding
Winter Garden, FL 34787

Last Updated 12/14/2021 09:48 AM
Project Title

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F

Physical Address View project details and contacts
City, State (County) Winter Park, FL   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed projects involve the following: 1) Master Infrastructure Phase 1C - Paving, grading, drainage and utilities for approximately 3,300 LF of 4-lane divided urban roadway, approximately 1,600 LF of 2-lane undivided urban roadway and construction of a roundabout at the intersection of Luminary Boulevard and Centerline Drive. 2) Centerline Drive Segment F - Paving, grading, drainage and utilities for approximately 1,100 LF of 2-lane undivided urban roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents