Similar Projects
Shingle Creek Regional Trail Phase 1, Segment 2 (from S.R. 528 to Destination Parkway)
Infrastructure
Bidding
$5,709,711 est. value
FL

Improvements to Boggy Creak Road (from Simpson Road to S.R. 417)
Infrastructure
Bidding
$850,000 est. value
Orlando, FL 32885

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Request for Qualifications for Construction Services
New Construction
Post-Bid
Orlando, FL 32811

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

Construction Manager at Risk Services Creative Village - Central Park and Roadway Improvements
Results
Less than $4,000,000 est. value
Orlando, FL 32802

Buena Vista Drive North - Median Closure
Construction
Orlando, FL 32800

SR 436- Milling and Resurfacing/Traffic Signals/Drainage Improvements
Infrastructure
Bidding
$1,251,339 est. value
FL

Poitras East Master Infrastructure Phase 1C and Centerline Drive Segment F
Post-Bid
Winter Park, FL

Road Improvements for Remington Community Development District
Results
$745,000 est. value
Orlando, FL 32801

Pearson Avenue Phase 2
Infrastructure
Bidding
Winter Park, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Orange County Construction Services for the ADA Pedestrian Safety Improvement Program
Term Contract
Results
Orlando, FL 32801

Sligh Boulevard and Columbia Street Improvements
Infrastructure
Bidding
$9,952,564 est. value
Orlando, FL 32806

Downtown Connector Trail
Infrastructure
Post-Bid
$3,767,000 est. value
Orlando, FL 32885

Last Updated 09/22/2021 02:02 PM
Project Title

SheltAir FBO Parking Lot Expansion

Physical Address View project details and contacts
City, State (County) Orlando, FL 32803   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method
Project Status Construction Commenced March 2021, Construction Complete as of September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition.
Division 26 - Electrical, Exterior Lighting, Parking Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Asphalt Curbs, Paving Specialties, Pavement Markings, Irrigation, Planting Accessories, Landscape Surfacing.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents