Similar Projects
Davis Highway Apartments
New Construction - 127,680 SF
Conception
$35,000,000 est. value
Pensacola, FL 32514

East Hood Drive Subdivision
New Construction
Conception
Less than $4,000,000 est. value
Pensacola, FL 32534

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

Dollar General #24239 / Molino
New Construction, Infrastructure - 10,670 SF
Design
$1,000,000 CJ est. value
Molino, FL 32577

U-Haul / Pansacola
New Construction, Infrastructure - 103,389 SF
Sub-Bidding
$8,000,000 CJ est. value
Pensacola, FL 32504

Elevate Apartments North & South
New Construction
Post-Bid
Pensacola, FL 32526

A Street Revitalization Phase I From Garden Street To Cervantes Street
Infrastructure
Post-Bid
$600,000 CJ est. value
Pensacola, FL 32501

Design-Bid-Build Paving Indefinite Delivery Indefinite Quantity Single Award Construction Contract for the Naval Air Station Pensacola Florida Area of Responsibility
Results
$15,000 to $1,000,000 est. value
Pensacola, FL 32508

Muldoon Granular Activated Carbon (GAC) Filter Piping
Infrastructure
Results
$1,281,890 CJ est. value
Pensacola, FL 32501

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

O'Reilly Auto Parts (PN7) #6651 / Pensacola
New Construction, Infrastructure - 7,453 SF
Construction
$500,000 CJ est. value
Pensacola, FL 32506

Dry Creek Subdivision
New Construction, Infrastructure
Pending Verification
$15,200,000 CJ est. value
Molino, FL 32577

Dry Creek Subdivision
New Construction, Infrastructure
Pending Verification
$15,200,000 CJ est. value
Molino, FL 32577

Hammocks Subdivision
New Construction, Infrastructure
Conception
$37,000,000 CJ est. value
Pensacola, FL 32526

Hurricane Sally Repairs for Myrtle Grove Fire Station
Infrastructure
Design
$840,000 CJ est. value
Pensacola, FL 32506

Last Updated 06/22/2023 04:10 PM
Project Title

Navy Crossing Phase 1

Physical Address View project details and contacts
City, State (County) Pensacola, FL 32506   (Escambia County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $22,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes the new construction of fourteen townhome buildings and a clubhouse with a swimming pool on 44.96 acres The square footage reflects the total project. As of June 22, 2023 the project is in planning stage. Escambia County approved a revised development order on February 15, 2023. Information regarding the architect, general contractor and method of selection has not been disclosed. A construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

2 Stories Above Grade, 246,660 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents