Similar Projects
Mockingbird Lane and Sherron Road Townhomes
New Construction, Infrastructure
Conception
$47,000,000 CJ est. value
Durham, NC 27701

Long Meadow Pool Replacement - CH430 - City of Durham
Infrastructure
Conception
$5,500,000 CJ est. value
Durham, NC 27701

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Core Durham
New Construction, Infrastructure - 120,000 SF
Design
$23,000,000 CJ est. value
Durham, NC 27701

Durham Angier Apartments
New Construction, Infrastructure - 792,663 SF
Bidding
$83,000,000 CJ est. value
Durham, NC 27703

FY23 Unscheduled Pipeline Repair
Infrastructure
Bidding
$300,000 CJ est. value
Durham, NC 27701

Duke School - Innovation Center & Library Renovation - Budget Pricing
New Construction, Renovation, Infrastructure - 13,799 SF
Sub-Bidding
$10,000,000 CJ est. value
Durham, NC 27705

Widens I-40 to A Six-Lane Facility From I-85
Post-Bid

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pavement Preservation 2021
Results
Durham, NC

Short Overlays District 1
Results

Northern Durham Convenience Site Construction
Construction
Less than $2,470,000 est. value
Rougemont, NC 27701

Westpoint
New Construction, Infrastructure
Pending Verification
$146,000,000 CJ est. value
Durham, NC 27704

Townes on Leesville
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Durham, NC 27703

Carrington Woods II
New Construction, Infrastructure
Design
$9,000,000 est. value
Durham, NC 27703

Last Updated 09/21/2022 08:14 PM
Project Title

Woodcroft Parkway Extension Project

Physical Address View project details and contacts
City, State (County) Durham, NC 27713   (Durham County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected September 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $3,079,900 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 21, 2022, this project is in the early design phase with concepts being developed and environmental surveys being conducted. This project is currently on hold due to funding. A firm timeline for construction has not been established. Proposed plans for extending Woodcroft Parkway west from its current terminus at Hope Valley Road (NC 751) to a new intersection with Garrett Road, in front of C.E Jordan High School. The project will reduce traffic congestion at the intersection of Garrett Road and Hope Valley Road, and provide a safer multi-modal connection between C.E. Jordan High School and surrounding neighborhoods/ *The closed solicitation has been included below for reference: The City of Durham is soliciting proposals for the services of a firm or team to provide roadway design engineering, environmental documentation, right of way acquisition and utility relocation plan services that includes, but is not necessarily limited to, the following task Proposed contract time: 2 years (1 year for design and 1 year for row activities) The LOI must include the name, address, telephone number, and e-mail address of the prime consultant's contact person for this RFLOI. Candidates should submit their LOIs in a sealed envelope. The envelope should be addressed for delivery to the Project Manager at the address shown above. Write the following prominently on the outside of the envelope: Request for Letters of Interest for Woodcroft Parkway Extension: TIP U-5823 All submissions, correspondence, and questions concerning this RFLOI should be directed to Antony Wambui at antony.wambui@durhamnc.gov or Attn: Antony Wambui, Department of Transportation, 101 City Hall Plaza, 4th Floor, Durham, NC 27701. Questions must be submitted to the person listed above no later than 5:00 PM Wednesday August 29, 2018. If you have concerns about this RFLOI that you believe are not being addressed by the project manager, please contact: Ellen Beckmann Senior Transportation Planner (mailing address same as above) (919) 560-4366 ext. 36412 Ellen.Beckmann@durhamnc.gov or Bill Judge, PE, Assistant Transportation Director for Engineering Services (mailing address same as above) (919) 560-4366 ext. 36420 Bill.Judge@durhamnc.gov The method of contractor selection has not been determined at this time start date 03/13/2019

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents