Similar Projects
Last Updated | 01/14/2021 03:16 PM |
Project Title | SOLICTATION - P1800/1801, DESIGN BUILD 2nd Marine Division and 2nd MLG Operations Center, Camp Lejeune, NC |
Physical Address | View project details and contacts |
City, State (County) | Camp Lejeune, NC (Onslow County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 to $250,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | P-1800, II MEF Operations Center and P-1801, 2nd MARDIV/2nd MLG Operations Center, Camp Lejeune NC: These projects construct a multi-story, administrative and academic instruction facility for II Marine Expeditionary Force (MEF) and 2nd Marine Expeditionary Brigade (MEB) Headquarters with Littoral Warfare Training Center (LWTC), a multi-story administrative facility for 2nd Marine Logistics Group (MLG) Headquarters, and Renovate Building #2 and construct a multi-story administrative addition for 2nd Marine Division (MARDIV) Headquarters. Construction to include reinforced CMU on concrete pile foundations with structural steel framing, reinforced masonry walls, brick veneer, reinforced concrete floors, and standing seam metal roofs. This project will provide Anti-Terrorism/Force Protection (AT/FP) features and comply with AT/FP regulations and physical security mitigation in accordance with DoD Minimum Anti-Terrorism Standards for Buildings. Built-in equipment includes elevators, emergency generators, fire pump with generator backup, raised computer flooring, under floor fire detection system and uninterruptable power supply. Site preparation includes removal of contaminated soil and grading and fill. Special foundation features include pile foundation. Paving and site improvements include clearing and grubbing, grading, parking, access road, curbs, sidewalks, landscaping, and storm water drainage. LEED compliance (outside) includes increased landscape area, pervious surfaces, and storm water retention pond, piping and structures. Electrical systems include primary and secondary distribution systems, lighting, transformers, and telecommunications infrastructure. Mechanical systems include heating, chemical vapor mitigation system, water lines, sanitary sewer lines, fire protection systems and supply lines. Environmental mitigation includes asbestos removal and abatement. This project will demolish the following facilities: H1, H14B, H17, H21, H21A, H22, H34, and H84. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |