Similar Projects
Last Updated | 11/10/2020 11:32 AM |
Project Title | PN 87539 SOF Operations Facility Secure Work Area |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28307 (Cumberland County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Number 87539: SOF Operations Facility Secure Work Area: Project includes renovation of an existing non-secure working area into a secure working area meeting ICD 705 requirements with private and semi-private offices, expanded Male/Female latrines, dividable 120 PN Classroom, VTC spaces, and upgraded HVAC system. Provide for STC-50 rated walls, doors, ceiling and floors, fire suppression; fire alarm, mass notification and security measures. Installation of cybersecurity measures including identity assurance and operational resilience to fire life safety systems, building automation (EMCS/UEMCS) systems, and electronic access control systems, integrated commercial intrusion detection security systems (CCTV, IDS), cable TV, a protected distribution system, and connection to the energy management control system. Provide sustainability/energy measures and building information systems. Access for individuals with disabilities will be provided. Furniture and equipment, comprehensive interior design, electronic security systems, and audio visual services are included. Existing facility construction consists of composite concrete floor slab with a steel rigid frame structure. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Heating and air conditioning will be provided by two (2) self-contained systems. One system for the Secure Working Area and a separate system for the Team Room Vault. |
||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |