Similar Projects
Last Updated | 01/17/2023 08:31 AM |
Project Title | Waterman Boulevard Sidewalk and Rancho Solano Medians Project |
Physical Address | View project details and contacts |
City, State (County) | Fairfield, CA 94533 (Solano County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $579,650 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work for the Waterman Boulevard Sidewalk Project consists of removing existing asphalt sidewalk to install new concrete sidewalk per the approved set of plans. This portion project is generally located along the north side of Waterman Boulevard between Oliver Road and Vista Del Rancho. Work for the Rancho Solano Median Extension Project consists of median extensions, as well as minor landscaping improvements. This portion of the project is located in various neighborhoods within Rancho Solano in the City of Fairfield. Each bid must be in accordance with the provisions of the contract documents now on file with the City Engineer, City of Fairfield, Fairfield, Californi Bid Guaranty and Bonding Requirements are as follows: (a) a bid guarantee in the amount of 10% of the bid price must be submitted with bid proposal, (b) the successful bidder shall furnish a payment bond and a performance bond in the amount of 100% of total bid price. Proof of compliance with insurance requirements (including certificates of insurance and additional insured endorsements) shall be provided by the successful contractor. Coverage shall be for the following amounts: (a) Commercial General Liability - $3,000,000 each occurrence, $6,000,000 each aggregate, (b) Automobile Liability - $1,000,000 each occurrence, and (c) Worker's Compensation/Employer's Liability - $1,000,000 each occurrence. For information concerning the proposed work, contact: Pavan Prasad, Junior Engineer City of Fairfield, Public Works Department 1000 Webster Street Fairfield, CA 94533 (707)428-7485 The Contractor shall perform with his/her own organization, work of a value amounting to not less than fifty (50) percent of the remainder obtained by subtracting from the total original value the sum of any items that may be designated as "Specialty Items" in the Special Provisions. Pursuant to the California Integrated Waste Management Act of 1989, Assembly Bill, at least 50% of the waste generated from this construction project, as measured by weight, shall be recycled. Whomever is responsible for collecting and transporting waste stored and/or transported in containers, as defined in Chapter 9 of the Fairfield Municipal Code (section 9.030 "Defined Terms and Phrases"), shall become authorized to do so by entering into a Collection Agreement approved by the City of Fairfield. The collectors and/or haulers of all other waste generated by this project shall not require authorization, but the recycling requirements will still apply and will be monitored for compliance by the City. August 23, 2022; 2:00PM Deadline for Bid Questions October 4, 2022 Anticipated Award of a Construction Contract Liquidated damages : (LDs) an amount equal to Five Hundred Dollars ($500) for each calendar day |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |