Similar Projects
Earlington Heights Metrorail Station Mixed Use
New Construction - 15,000 SF
Conception
Miami, FL 33142

Our Lady of the Rosary School Expansion
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami, FL 33176

Rides Installation and Operation at Zoo Miami
Post-Bid
Miami, FL 33177

Pawcrest Dog Park Entryway
Post-Bid
Pinecrest, FL 33156

Roby George Park Locker Room Improvements and Outdoor Picnic Tables and Benches for Mayor Roscoe Warren Park
Results
Homestead, FL 33030

City Parks Poured-In-Place Playground Surfacing
Results
South Miami, FL

Soleste Spring Gardens
New Construction
Construction
$36,000,000 est. value
Miami, FL

Five Park
New Construction
Construction
$345,000,000 est. value
Miami Beach, FL 33139

Naranja Lakes Apartments
New Construction - 244,466 SF
Conception
$10,000,000 CJ est. value
Leisure City, FL

Quail Roost Park-New Playground Expansion and Surface Conversion
Post-Bid
Less than $592,000 est. value
Miami, FL 33157

Baseball Field Maintenance at Palmer Park
Results
South Miami, FL 33143

Lake Sana Development
New Construction
Conception
Miami, FL 33010

Sgt.Delancy - Playground Renovation
Post-Bid
Less than $263,200 est. value
Miami, FL 33176

Franjo Park Improvements Project
Results
Cutler Bay, FL 33189

Modello Park - Playground Renovation
Post-Bid
Less than $268,100 est. value
Homestead, FL 33033

Last Updated 08/28/2020 07:41 AM
Project Title

Tree Island Park - Phase 1 Park Development

Physical Address View project details and contacts
City, State (County) Miami, FL 33194   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,465,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes but is not limited to; Earthwork including Site Clearing & Grubbing, De-mucking of on-site and off-site all areas were scope of work takes place which include under all right of way improvements shown, Demolition, Site Filling, Water and Sewer installations, finish work of the Tree Island Park Phase 1 Development including off-site construction of parking spaces, sidewalks, curb and gutter, striping, signage along SW 10th Street extending to SW 149th Avenue, New Pedestrian Cross Walk Signalization Systems at the South & West sides of the intersection of S.W. 147 Ave. and S.W. 10th Street, on-site construction of a restroom building, dog park, playground, fitness area, two (2) Shelters, dumpster enclosure, connecting lighted walkways and lighted parking lot.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents