Similar Projects
East Lake Sports and Community Complex Expansion
New Construction, Addition, Infrastructure
Design
$14,000,000 est. value
Mount Plymouth, FL 32776

Road Resurfacing and Related Services
Infrastructure
Bidding
FL

Alternative Paving Methods
Term Contract, Infrastructure
Bidding
$500,000 est. value
Kissimmee, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Silicone Joint Sealer
Infrastructure
Post-Bid

Asphalt Repair
Results
Less than $500,000 est. value

Resurfacing/Base Work/Drainage Improvements/Sidewalk
Results
Less than $8,691,547 est. value
FL

Asphaltic Concrete
Term Contract
Bidding
FL

On-Call Construction of Bus Stop Pads and Related Services
Term Contract, Infrastructure
Post-Bid
FL

Shoulder and Utility Strip Rework
Results
Less than $89,000,000 est. value

Evaluation of Enhanced-Friction Asphalt Overlays and Surface Treatments
Infrastructure
Post-Bid

Widening - Hot Plant Mix
Results
Less than $153,406,828 est. value

District Five Ocala Operations Center Asphalt, Mill, Overlay, Parking Lot Striping
Infrastructure
Post-Bid

Road Resurfacing and Related Services
Results
FL

Asphalt Paving and Resurfacing
Infrastructure
Post-Bid
Tavares, FL

Last Updated 04/14/2022 08:37 AM
Project Title

CR 42 Lane Departure Mitigation for Marion County Line to SR 44

Physical Address View project details and contacts
City, State (County) FL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,138,017
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This CR 42 Lane Departure Mitigation safety improvements project is with Lake County. The total project length is 19.284-miles from the Marion County line to SR 44. Project scope involves constructing 6-foot to 8-foot wide shoulders (5-foot wide paved including stabilization, base, asphalt and 1-foot to 3-foot unpaved) for approximately 0.95 miles in curves along CR 42 and installing center and shoulder audible vibratory treatment (AVT). Other construction activities include mobilization, maintenance of traffic, erosion control, clearing and grubbing (including selective clearing and grubbing), excavation, embankment, turnout reconstruction, curb and gutter, guardrail installation, sodding, new mast arm signalization installation at the intersection of CR 42 and CR 439, drainage improvements, signing and pavement markings.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents