Similar Projects
Woodward Avenue Road and Utility Improvements
Bidding
Less than $500,000 est. value
Eustis, FL 32726

Shoulder Rework and Culvert Pipe Desilt
Bidding
Less than $1,110,675 est. value
FL

Road Resurfacing and Related Services
Post-Bid
FL

CR 42 Lane Departure Mitigation for Marion County Line to SR 44
Post-Bid
FL

Traffic OPS Improvement
Results
Less than $1,000,000 est. value

Bike Path/Trail/Earthwork
Results
Less than $3,130,502 est. value

Roadway Depression Repair
Bidding
Less than $165,000 est. value
FL

Resurfacing
Results
Less than $3,659,931 est. value
Eustis, Mount Dora, FL 32727

Hilochee WMA Road Capping
Results
Less than $25,726 est. value
FL

Asphalt Repair
Results
Less than $1,107,400 est. value
FL

Add Lanes and Reconstruct/ Bridge Removal
Results
Less than $46,251,724 est. value
FL

Island Drive Improvement Construction Project
Results
Less than $189,827 est. value
Howey-in-the-Hills, FL 34737

CR 455 and Ridgewood Avenue Roundabout
Results
Less than $988,072 est. value
Montverde, FL 32778

Sealcoating and Striping to Asphalt Surfaces at Various County Parks
Results
Altoona, Astatula, Astor, Clermont, De Land, Eustis, Ferndale, Groveland, Leesburg, Minneola, Mount Dora, Mount Plymouth, Paisley, Sorrento, Tavares, Umatilla, Winter Garden, FL

Challenger Drive and Lenze Drive Special Assessment
Results
$1,113,831 to $1,534,600 est. value
Tavares, FL 32778

Last Updated 01/28/2021 06:45 AM
Project Title

Resurfacing/Base Work/Drainage Improvements/Sidewalk

Physical Address View project details and contacts
City, State (County) FL   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,691,547
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of work to mill and resurface the southbound lanes only, pedestrian, bicycle, and safety items along both sides of the road along SR 19. The addition of sidewalk and access management improvements (median changes) are included throughout the project limits. Intersection lighting is proposed at C.R. 452. Section 0001 Roadway 0101- 1- Mobilization (44113515201) Ls 1.000 0101- 1- Mobilization (44113525201) Ls 1.000 0102- 1- Maintenance Of Traffic (44113515201) Ls 1.000 0102- 1- Maintenance Of Traffic (44113525201) Ls 1.000 0102- 4- Pedestrian Special Detour (44113515201) Ls 1.000 0102- 14- Traffic Control Officer Hr 1,530.000 0102- 60- Work Zone Sign Ed 44,240.000 0102- 71- 13 Temporary Barrier, f&i, Low Profile, Concrete Lf 516.000 0102- 71- 16 Temporary Barrier, f&i, Free Standing Lf 1,500.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 48,340.000 0102- 74- 8 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Fd 52,055.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 184.000 0102- 78- Temporary Raised/Retroreflective Pavement Marker Ea 1,389.000 0102- 89- 1 Temporary Crash Cushion, Redirective Option Lo 1.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 1,288.000 0102-104- Temporary Signalization And Maintenance, Intersection Ed 560.000 0102-107- 1 Temporary Traffic Detection And Maintenance, Intersection Ed 560.000 0102-115- Type Iii Barricade Ed 7,280.000 0102-150- 1 Portable Regulatory, Sign Ed 610.000 0102-150- 2 Radar Speed Display Unit Ed 610.000 0102-909- Temporary Raised Rumble Strips- Per Day, Includes All Ets And Relocations Da 165.000 0104- 10- 3 Sediment Barrier Lf 18,743.000 0104- 11- Floating Turbidity Barrier Lf 378.000 0104- 18- Inlet Protection System Ea 66.000 0107- 1- Litter Removal Ac 592.220 0107- 2- Mowing Ac 405.970 0110- 1- 1 Clearing & Grubbing (44113515201) Ls 1.000 0110- 1- 1 Clearing & Grubbing (44113525201) Ls 1.000 0110- 4- 10 Removal Of Existing Concrete Sy 1,653.000 0110- 7- 1 Mailbox, f&i Single Ea 6.000 0120- 1- Regular Excavation Cy 9,113.300 0120- 6- Embankment Cy 14,069.800 0160- 4- Type b Stabilization Sy 34,530.000 0285-701- Optional Base, Base Group 01 Sy 1,133.000 0285-703- Optional Base, Base Group 03 Sy 261.000 0285-709- Optional Base, Base Group 09 Sy 11,424.000 0285-713- Optional Base, Base Group 13 Sy 10,440.000 0286- 1- Turnout Construction/Driveway Base- Optional Materials Sy 4,605.000 0327- 70- 4 Milling Exist Asph Pavt, 3" Avg Depth Sy 1,118.000 0327- 70- 6 Milling Exist Asph Pavt, 1 1/2" Avg Depth Sy 11,425.000 0327- 70- 8 Milling Exist Asph Pavt, 2 1/2" Avg Depth Sy 26,359.000 0327- 70- 11 Milling Exist Asph Pavt, 2 1/4" Avg Depth Sy 53,257.000 0327- 70- 17 Milling Exist Asph Pavt, 3 1/4" Avg Depth Sy 953.000 0327- 70- 19 Milling Exist Asph Pavt, 3/4" Avg Depth Sy 6.000 0334- 1- 53 Superpave Asphaltic Concrete, Traffic c, Pg76-22 Tn 14,046.600 0337- 7- 25 Asphalt Concrete Friction Course, Inc Bit, Fc-5, Pg 76-22 Tn 4,361.300 0339- 1- Miscellaneous Asphalt Pavement Tn 20.100 0425- 1-361 Inlets, Curb, Type p-6, <10` Ea 2.000 0425- 1-471 Inlets, Curb, Type 7, <10` Ea 1.000 0425- 1-521 Inlets, Dt Bot, Type c,<10` Ea 18.000 0425- 1-525 Inlets, Ditch Bottom, Type c, Partial Ea 1.000 0425- 1-543 Inlets, Ditch Bottom, Type d, j Bot, <10` Ea 1.000 0425- 1-551 Inlets, Dt Bot, Type e, <10` Ea 1.000 0425- 2- 41 Manholes, p-7, <10` Ea 3.000 0425- 2- 43 Manholes, p-7, Partial Ea 1.000 0425- 2- 73 Manholes, j-7, Partial Ea 2.000 0425- 2- 93 Manholes, j-8, Partial Ea 4.000 0425- 5- Manhole, Adjust Ea 1.000 0430-174-115 Pipe Culvert, Optional Material, Round, 15"Sd Lf 21.000 0430-174-118 Pipe Culvert, Optional Material, Round, 18"Sd Lf 786.000 0430-174-124 Pipe Culvert, Optional Material, Round, 24"Sd Lf 325.000 0430-174-130 Pipe Culvert, Optional Material, Round, 30"Sd Lf 76.000 0430-174-218 Pipe Culvert, Optional Material, Other Shape - Ellip/Arch, 18"Sd Lf 322.000 0430-174-224 Pipe Culvert, Optional Material, Other Shape - Ellip/Arch, 24"Sd Lf 19.000 0430-175-115 Pipe Culvert,Optional Material,Round, 15"s/Cd Lf 2,662.000 0430-175-118 Pipe Culvert,Optional Material,Round, 18"s/Cd Lf 611.000 0430-175-124 Pipe Culvert,Optional Material,Round, 24"s/Cd Lf 564.000 0430-175-130 Pipe Culvert, Opt Material, Round, 30"s/Cd Lf 39.000 0430-175-224 Pipe Culvert,Optional Material,Other Shape-Elip/Arch, 24"s/Cd Lf 6.000 0430-982-123 Mitered End Section, Optional Round, 15" Cd Ea 1.000 0430-984-123 Mitered End Section, Optional Round, 15" Sd Ea 2.000 0430-984-125 Mitered End Section, Optional Round, 18" Sd Ea 42.000 0430-984-129 Mitered End Section, Optional Round, 24" Sd Ea 22.000 0430-984-133 Mitered End Section , Optional Round, 30" Sd Ea 4.000 0430-984-625 Mitered End Sect, Optional - Elliptical / Arch, 18" Sd Ea 6.000 0430-984-629 Mitered End Sect, Optional - Elliptical / Arch, 24" Sd Ea 2.000 0515- 1- 2 Pipe Handrail - Guiderail, Aluminum Lf 2,731.000 0520- 1- 7 Concrete Curb & Gutter, Type e Lf 12,033.000 0520- 2- 2 Concrete Curb, Type b Lf 64.000 0520- 70- Concrete Traffic Separator, Special- Variable Width Sy 10.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 13,806.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 3,168.000 0527- 2- Detectable Warnings Sf 1,183.000 0530- 3- 4 Riprap, Rubble, f&i, Ditch Lining Tn 569.200 0530- 74- Bedding Stone Tn 409.000 0536- 1- 1 Guardrail -Roadway, General Tl-3 Lf 298.000 0536- 6- Pipe Rail For Guardrail Lf 1,020.000 0536- 7- 3 Special Guardrail Post- Encased Post For Shallow Mount Ea 4.000 0536- 73- Guardrail Removal Lf 291.000 0536- 85- 20 Guardrail End Treatment- Trailing Anchorage Ea 1.000 0536- 85- 24 Guardrail End Treatment- Parallel Approach Terminal Ea 2.000 0570- 1- 2 Performance Turf, Sod Sy 93,239.000 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 44.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 61.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 3.000 0695- 1- 1 Traffic Monitoring Site Vehicle Sensor-Non-Weight, Furnish & Install Ea 4.000 0695- 6- 12 Traffic Monitoring Site Inductive Loop Assembly, Furnish & Install, 2 Loops Ea 4.000 0695- 7-162 Traffic Monitoring Site Cabinet, f&i, Type 3, 2 Pane Back, Pedestal Mount Ea 1.000 0695- 7-600 Traffic Monitoring Site Cabinet, Remove Existing Cabinet Ea 3.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 7.803 0710- 11-102 Painted Pavement Markings, Standard, White, Solid For Interchange And Urban Island, 8" Gm 1.782 0710- 11-123 Painted Pavement Markings, Standard, White, Solid For Crosswalk And Roundabout, 12" Lf 4,908.000 0710- 11-124 Painted Pavement Markings, Standard, White, Solid For Diagonal Or Chevron, 18" Lf 2,691.000 0710- 11-125 Painted Pavement Markings, Standard, White, Solid For Stop Line Or Crosswalk, 24" Lf 822.000 0710- 11-131 Painted Pavement Markings, Standard, White, Skip, 10-30 Or 3-9 Skip, 6" Wide Gm 4.186 0710- 11-141 Painted Pavement Markings, Standard, White, 2-4 Dotted Uideline/ 6-10 Dotted Extension, 6" Gm 1.410 0710- 11-160 Painted Pavement Markings, Standard, White, Message Or Symbol Ea 4.000 0710- 11-170 Painted Pavement Markings, Standard, White, Arrows Ea 154.000 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 7.913 0710- 11-224 Painted Pavement Markings, Standard, Yellow, Solid For Iagonal Or Chevron, 18" Lf 514.000 0710- 11-241 Painted Pavement Markings, Standard, Yellow, 2-4 Otted Guideline/6-10 Dotted Extension, 6" Gm 0.534 0999- 25- Initial Contingency Amount, Do Not Bid (44113515201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (44113525201) Ls 1.000 Section 0002 Signing 0546- 72- 3 Ground-In Rumble Strips, 8" Sinusoidal Gm 6.505 0700- 1- 11 Single Post Sign, f&i Ground Mount, Up To 12 Sf As 41.000 0700- 1- 12 Single Post Sign, f&i Ground Mount, 12-20 Sf As 41.000 0700- 1- 50 Single Post Sign, Relocate As 4.000 0700- 1- 60 Single Post Sign, Remove As 157.000 0700- 2- 50 Multi- Post Sign, Ground Mount, Relocate As 1.000 0700- 3-501 Sign Panel, Relocate, Up To 12 Sf Ea 9.000 0700- 3-601 Sign Panel, Remove, Up To 12 Sf Ea 5.000 0705- 10- 1 Object Marker, Type 1 Ea 18.000 0705- 11- 1 Delineator, Flexible Tubular Ea 42.000 0710- 11-290 Painted Pavement Markings, Standard, Yellow, Island Nose Sf 670.000 0710- 90- Painted Pavement Markings, Final Surface (44113515201) Ls 1.000 0710- 90- Painted Pavement Markings, Final Surface (44113525201) Ls 1.000 0711- 11-102 Thermoplastic, Standard, White, Solid, 8" For Interchange And Urban Island Gm 1.782 0711- 11-123 Thermoplastic, Standard, White, Solid, 12" For Crosswalk And Roundabout Lf 3,928.000 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" For Diagonals And Chevrons Lf 2,691.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line Nd Crosswalk Lf 730.000 0711- 11-141 Thermoplastic, Standard, White, 2-4 Dotted Guideline/ 6-10 Ap Extension, 6" Gm 1.410 0711- 11-160 Thermoplastic, Standard, White, Message Or Symbol Ea 4.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 150.000 0711- 11-224 Thermoplastic, Standard, Yellow, Solid, 18" For Diagonal Or Chevron Lf 514.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6" Gm 0.534 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 1,007.000 0711- 15-101 Thermoplastic, Standard-Open Graded Asphalt Surfaces White, Solid, 6" Gm 7.163 0711- 15-131 Thermoplastic, Standard-Open Graded Asphalt Surfaces, White, Skip, 6",10-30 Skip Or 3-9 Lane Drop Gm 4.186 0711- 15-201 Thermoplastic, Standard-Open Graded Asphalt Surfaces, Yellow, Solid, 6" Gm 6.691 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 0.350 0711- 16-201 Thermoplastic, Standard-Other Surfaces, Yellow, Solid,6" Gm 0.108 Section 0003 Lighting 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 5,770.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 4,331.000 Section 0004 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 137.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 640.000 0630- 2- 14 Conduit, Furnish & Install, Aboveground Lf 70.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 2.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 14.000 0641- 2- 60 Prestressed Concrete Pole, Complete Pole Removalpedestal/Service Pole Ea 3.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 10.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 10.000 0653- 1- 60 Pedestrian Signal, Remove Ped Signal- Pole/Pedestal To Remain As 2.000 0660- 1-600 Loop Detector Inductive, Remove- Cabinet To Remain Ea 2.000 0660- 3- 11 Vehicle Detection System- Microwave, Furnish & Install Cabinet Equipment Ea 2.000 0660- 3- 12 Vehicle Detection System- Microwave, Furnish & Install, Above Ground Equipment Ea 7.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 10.000 0665- 1- 60 Pedestrian Detector, Remove- Pole/Pedestal To Remain Ea 2.000 0670- 5-400 Traffic Controller Assembly, Modify As 2.000 0700- 3-601 Sign Panel, Remove, Up To 12 Sf Ea 2.000

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents