Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Northglen Stream Improvements - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

2022 Prairie Ridge Aquatic Center - Resurfacing Project
Renovation, Infrastructure
Post-Bid
$225,000 CJ est. value
Ankeny, IA 50023

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Results
West Des Moines, IA 50266

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue
Infrastructure
Results
WDM, IA 50266

Olive Garden / Des Moines
New Construction, Infrastructure - 6,489 SF
Construction
$2,500,000 CJ est. value
Des Moines, IA 50320

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Kum & Go Grand Avenue and Raccoon River Drive / West Des Moines
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
West Des Moines, IA 50266

Easton Boulevard - University Avenue - Four Mile Creek - ST263 C038EG - City of Des Moines
Infrastructure
Conception
$1,561,369 CJ est. value
Des Moines, IA 50309

Northglen Trail Replacement - City of Johnston
Infrastructure
Design
$400,000 CJ est. value
Johnston, IA 50131

Principal Park Master Plan - Phase 1 Improvements
Addition, Demolition, Renovation, Infrastructure - 14,000 SF
Post-Bid
$5,218,000 CJ est. value
Des Moines, IA 50309

Last Updated 06/01/2023 10:39 AM
Project Title

Southeast 3rd Street Area Storm Sewer Improvements - STM-20-006 - City of Ankeny

Physical Address View project details and contacts
City, State (County) Ankeny, IA 50021   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of storm sewer infrastructure improvements in underserved sections of the SE 3rd Street area, which is located south of East 1st Street, north of SE Peterson Drive, east of South Ankeny Boulevard and west of SE Trilein Drive. The proposed storm sewer infrastructure improvements will include footing drain/sump collector lines, storm sewer pipe, intakes, utility accesses and related pavement removal and replacement necessary to install a trunk storm sewer along SE 3rd Street from South Ankeny Boulevard to SE Trilein Drive. The purpose of the project is to address areas that lack storm sewer infrastructure or have known capacity issues within the existing storm sewer network. The June 30, 2018 extreme flash flooding event and other high intensity rainfall events in the past several years have demonstrated the need for adding storm sewer infrastructure in this low-lying area with poorly-drained soils. Adding sump collector lines and storm sewer will help reduce drainage issues and minor flooding on public and private properties. The projects proposed schedule includes design work in 2021 and construction of the project in 2022 and 2023. The proposed storm sewer improvements on SE 3rd Street will need to be coordinated with the Municipal Utilities Departments proposed SE 3rd Street Trunk Sanitary Sewer Extension, between SE Grant Street and SE Sharon Drive and water main replacement along SE 3rd Street. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. As of June 1, 2023, no new information available *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents