Similar Projects
Last Updated | 06/01/2023 10:39 AM |
Project Title | Southeast 3rd Street Area Storm Sewer Improvements - STM-20-006 - City of Ankeny |
Physical Address | View project details and contacts |
City, State (County) | Ankeny, IA 50021 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,250,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of storm sewer infrastructure improvements in underserved sections of the SE 3rd Street area, which is located south of East 1st Street, north of SE Peterson Drive, east of South Ankeny Boulevard and west of SE Trilein Drive. The proposed storm sewer infrastructure improvements will include footing drain/sump collector lines, storm sewer pipe, intakes, utility accesses and related pavement removal and replacement necessary to install a trunk storm sewer along SE 3rd Street from South Ankeny Boulevard to SE Trilein Drive. The purpose of the project is to address areas that lack storm sewer infrastructure or have known capacity issues within the existing storm sewer network. The June 30, 2018 extreme flash flooding event and other high intensity rainfall events in the past several years have demonstrated the need for adding storm sewer infrastructure in this low-lying area with poorly-drained soils. Adding sump collector lines and storm sewer will help reduce drainage issues and minor flooding on public and private properties. The projects proposed schedule includes design work in 2021 and construction of the project in 2022 and 2023. The proposed storm sewer improvements on SE 3rd Street will need to be coordinated with the Municipal Utilities Departments proposed SE 3rd Street Trunk Sanitary Sewer Extension, between SE Grant Street and SE Sharon Drive and water main replacement along SE 3rd Street. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. As of June 1, 2023, no new information available *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |