Similar Projects
North County Elementary School - Palm Beach County
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
West Palm Beach, FL 33401

West Acreage Area Elementary School - Palm Beach County School
New Construction, Infrastructure
Conception
$35,000,000 CJ est. value
West Palm Beach, FL 33401

Villages of Windsor
New Construction, Infrastructure
Design
$71,000,000 CJ est. value
Boynton Beach, FL 33426

Villages of Windsor
New Construction, Infrastructure
Design
$71,000,000 CJ est. value
Boynton Beach, FL 33426

7-Eleven #41361
New Construction, Build-Out - 4,300 SF
Post-Bid
$1,200,000 est. value
Lake Worth, FL 33461

CVS #7891 Parking Lot ADA Improvements / Lake Worth - Rebid
Infrastructure
Post-Bid
$100,000 CJ est. value
Lake Worth, FL 33467

Minor Toll Facility Construction-South Florida
New Construction
Results

Southern Traffic Circle Renovation
Infrastructure
Results
Palm Beach, FL

Retail/Office Building
New Construction, Build-Out, Demolition - 6,945 SF
Construction
$4,036,013 est. value
Boca Raton, FL 33427

Retail/Office Building
New Construction, Build-Out, Demolition - 6,945 SF
Construction
$4,036,013 est. value
Boca Raton, FL 33427

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

Western Communities High School - Palm Beach County
New Construction, Infrastructure
Conception
$118,000,000 CJ est. value
West Palm Beach, FL 33401

Groves Town Center - Master Plan
New Construction - 39,609 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Loxahatchee, FL 33470

RFP Engineering - SR-15/E Main ST From Lake Ave to SR-700/Connors Hwy
Infrastructure
Post-Bid
$5,198,220 CJ est. value
Fort Lauderdale, FL 33301

Last Updated 01/08/2024 04:10 PM
Project Title

The Ellie at Logan Ranch

Physical Address View project details and contacts
City, State (County) Boynton Beach, FL 33473   (Palm Beach County)
Category(s) Commercial, Entertainment/Recreation, Heavy and Highway, Industrial/Manufacturing, Residential
Sub-Category(s) Apartments/Condominiums, Convention/Exhibit Center, Fitness Center, Food/Beverage Service, Hotel/Motel, Manufacturing/Processing Plant, Office, Park/Playground, Retail, Site Development, Theaters/Auditoriums
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected April 2024
Bids Due View project details and contacts
Estimated Value $200,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for six four-story buildings and seven two-story buildings. As of January 8, 2024, this project has been approved. A new developer and homebuilder are on board. An architect has been selected. Construction is estimated to begin second quarter 2024.

Details

New Construction, New Construction. 261,360 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic Equipment, Exercise Equipment, Recreational Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Multiple Seating, Fixed Audience Seating, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Sound, Vibration, and Seismic Control.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents