Similar Projects
BDI Mowing
Post-Bid
Less than $280,000 est. value
FL

Safe Harbor Marina @ North Palm Beach
Renovation
Post-Bid
North Palm Beach, FL 33408

Resodding Slope Restoration
Results
Less than $500,000 est. value

Emergency Operations/ Excavation/Embankment/Fabric Formed Concrete Riprap
Results
Less than $10,324,926 est. value
Canal Point, FL 33438

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

FPL Okeechobee Transmission Corridor
New Construction
Construction
$1,685,000 est. value
West Palm Beach, FL 33409

Landscape Maintenance
Post-Bid

Gateways Entry Feature Landscaping on Indiantown Road at the Turnpike and Center Street
Results
$270,000 est. value
Jupiter, FL 33458

CVS # 7891 - ADA Exterior Improvements
Renovation
Post-Bid
$225,000 est. value
Lake Worth, FL 33467

Landscape Material Services
Term Contract
Results
$350,000 est. value
Boca Raton, FL

8.5 Square Mile Area (SMA) Mechanical Restoration
Post-Bid
West Palm Beach, FL

Mowing and Litter Removal
Infrastructure
Results
$450,000 est. value
FL

Landscape Area Maintenance
Post-Bid
$1,500,000 est. value

Tree Trimming, Pruning and Removal for Public Roadways and Swales
Term Contract, Infrastructure
Results
$200,000 est. value
Boca Raton, FL

Specialized Landscape Services
Term Contract
Post-Bid
FL

Last Updated 05/30/2022 01:33 AM
Project Title

Southern Traffic Circle Renovation

Physical Address View project details and contacts
City, State (County) Palm Beach, FL   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Qualified landscaping contractor to renovate the Southern Blvd. Traffic Circle and adjacent areas. Work will include: any required safety fencing, MOT/TTC, excavation, grading, distribution of soil, cap rock boulder work, base preparation, irrigation and landscaping. A significant amount of onsite coordination with SMI Landscape Architecture during all phases of the project will be integral to successful completion, as their firm will be directing the final grading and boulder placement on site. The contractor shall be responsible for: 1. Removal and relocation of three (3) Pony Tail Palms from the site to Ibis Park 2. All soil and grading 3. Delivery and installation of Geiger trees 4. Relocation/transplant of donated coconut trees from a property on the Island and to the site 5. Relocation of Agave on site for balance and coverage 6. Relocation of capstones on site 7. Irrigation is in place and functional with effective coverage. The controller may require relocation. Bubblers will need to be added and any damage would need to be repaired prior to supply and installation of new turf 8. Furnish and install all plants listed in the Plant Schedule under shrubs 9. Supply and installation of new turf

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents