Similar Projects
Highpoint
New Construction - 588,000 SF
Conception
Stuart, FL 34997

Catty Shack
New Construction, Addition
Conception
$8,000,000 est. value
Jacksonville, FL

Drivers Club Miami
New Construction - 209,100 SF
Design
$100,000,000 est. value
Miami Gardens, FL

Oviedo on the Park - Lot 4 - Sitework
New Construction
Design
Oviedo, FL 32765

Mechanical Site Prep of Approximately 135 Acres
Bidding
FL

Honey Hill Drive Off-Site Improvements Project
Bidding
$165,000 est. value
Miramar, FL 33027

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

KHS Site Improvements - (Sanitary Line)
Post-Bid
Keystone Heights, FL 32656

Job Order Contracting Services for Civil Site Work
Results
Tampa, FL 33602

Unsolicited Proposal for the Development, Operation and Maintenance of a Soccer Complex and Other Facilities
Results
Miramar, FL

Morgan's Cove Assisted Living - Site Work
Construction
$35,000,000 est. value
Saint Augustine, FL

Harlem Heights - Site Development
New Construction
Construction
Fort Myers, FL

11134 New Kings Road RV Park
New Construction
Pending Verification
Jacksonville, FL 32219

Pace Commons
New Construction
Pending Verification
Pace, FL

Loretto Road Subdivision
New Construction
Conception
Jacksonville, FL

Last Updated 02/18/2021 01:32 AM
Project Title

Emergency Operations/ Excavation/Embankment/Fabric Formed Concrete Riprap

Physical Address View project details and contacts
City, State (County) Canal Point, FL 33438   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,324,926
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of, but are not limited to, excavation (regular, channel), embankment (regular, channel), revetment systems (rubble riprap, fabric formed concrete riprap), guardrail (regular, special post, transition), miscellaneous asphalt pavement, monitor existing structures (inspection and settlement, vibration), signing (single post,beacon), pavement markings (raised rumble strips, object markers, painted, thermoplastic), and signalization (conduit, cable, mast arms, luminaires) along SR 700 (Old Conners Hwy.). Section 0001 Roadway 0101- 1- Mobilization (44315515201) Ls 1.000 0102- 1- Maintenance of Traffic (44315515202) Ls 1.000 0102- 2-200 Special Detour- Temporary Pavement (44315515202) Ls 1.000 0102- 14- Traffic Control Officer Hr 36.000 0102- 60- Work Zone Sign Ed 24,950.000 0102- 71- 15 Temporary Barrier, F&i, Anchored Lf 300.000 0102- 71- 16 Temporary Barrier, F&i, Free Standing Lf 25.000 0102- 71- 26 Temporary Barrier, Relocate, Free Standing Lf 25.000 0102- 74- 1 Channelizing Device- Types I, Ii, Di, Vp, Drum, or Lcd Ed 21,600.000 0102- 78- Temporary Raised/retroreflective Pavement Marker Ea 1,500.000 0102- 89- 1 Temporary Crash Cushion, Redirective Option Lo 4.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 2,970.000 0102-104- Temporary Signalization and Maintenance, Intersection Ed 840.000 0102-115- Type Iii Barricade Ed 2,780.000 0102-909- Temporary Raised Rumble Strips- Per Day, Includes Allsets and Relocationsda 30.000 0104- 10- 3 Sediment Barrier Lf 28,230.000 0104- 11- Floating Turbidity Barrier Lf 20,619.000 0104- 12- Staked Turbidity Barrier- Nylon Reinforced Pvc Lf 65.000 0104- 15- Soil Tracking Prevention Device Ea 3.000 0107- 1- Litter Removal Ac 569.830 0107- 2- Mowing Ac 407.550 0108- 1- Monitor Existing Structures- Inspection and Settlementmonitoring (44315515201)ls 1.000 0108- 2- Monitor Existing Structures- Vibration Monitoring(44315515201)ls 1.000 0110- 1- 1 Clearing & Grubbing (44315515201) Ls 1.000 0120- 1- Regular Excavation Cy 12,382.600 0120- 5- Channel Excavation Cy 7,637.400 0120- 6- Embankment Cy 3,046.100 0120- 6-103 Embankment, Channel Embankment, Project 443155-1-52-01 Cy 40,998.900 0145- 2- Geosynthetic Reinforced Foundation Over Soft Soil Sy 4,988.000 0327- 70- 12 Milling Existing Asphalt Pavement, 1 1/4" Avg Depth Sy 8,801.000 0337- 7- 82 Asphalt Concrete Friction Course,traffic C, Fc-9.5, Pg 76-22tn 605.100 0339- 1- Miscellaneous Asphalt Pavement Tn 773.800 0530- 3- 4 Riprap, Rubble, F&i, Ditch Lining Tn 3,646.800 0530- 74- Bedding Stone Tn 2,620.200 0536- 1- 1 Guardrail -roadway, General Tl-3 Lf 10,000.000 0536- 7- 1 Special Guardrail Post- Deep Post for Slope Breakcondition- Timber or Steelea 1,587.000 0536- 8-112 Guardrail Transition Connection to Rigid Barrier, F&iindex 536-001, Approach Tl-3ea 1.000 0536- 8-113 Guardrail Transition Connection to Rigid Barrier, F&iindex 536-001, Trailingea 2.000 0536- 73- Guardrail Removal Lf 10,000.000 0536- 85- 26 Guardrail End Treatment- Type Crt Ea 1.000 0570- 1- 1 Performance Turf Sy 35,459.000 0710- 11-101 Painted Pavement Markings, Standard, White, Solid, 6" Gm 0.620 0710- 11-201 Painted Pavement Markings, Standard, Yellow, Solid, 6" Gm 0.628 0710- 11-241 Painted Pavement Markings, Standard, Yellow, 2-4 Dottedguideline/6-10 Dotted Extension, 6"Gm 0.029 0920-530- 1 Fabric Formed Concrete Riprap, Project 443155-1-52-01 And443155-1-52-02sy 55,618.000 0999- 25- Initial Contingency Amount, Do Not Bid (44315515201) Ls 1.000 0999- 25- Initial Contingency Amount, Do Not Bid (44315515202) Ls 1.000 Section 0002 Signing 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 5.000 0632- 7- 2 Signal Cable- Repair/replace/other, Furnish & Install Lf 490.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 2.000 0700- 1- 11 Single Post Sign, F&i Ground Mount, Up to 12 Sf as 9.000 0700- 1- 12 Single Post Sign, F&i Ground Mount, 12-20 Sf as 6.000 0700- 1- 13 Single Post Sign, F&i Ground Mount, 21-30 Sf as 1.000 0700- 1- 31 Single Post Sign, F&i Bridge Mount Index 11870/700-012, Upto 12 Sfas 1.000 0700- 1- 33 Single Post Sign, F&i Bridge Mount Index 11870/700-012, 21-30sfas 2.000 0700- 1- 60 Single Post Sign, Remove as 19.000 0700- 12- 12 Sign Beacon, F&i Ground Mount- Ac Powered, Two Beacon as 1.000 0705- 10- 1 Object Marker, Type 1 Ea 3.000 0710- 90- Painted Pavement Markings, Final Surface (44315515201) Ls 1.000 0711- 11-102 Thermoplastic, Standard, White, Solid, 8" Forinterchange and Urban Islandgm 0.018 0711- 11-124 Thermoplastic, Standard, White, Solid, 18" for Diagonalsand Chevronslf 59.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" for Stop Lineand Crosswalklf 23.000 0711- 11-241 Thermoplastic, Standard, Yellow, 2-4 Dotted Guide Line /6-10 Dotted Extension Line, 6"Gm 0.015 0711- 16-101 Thermoplastic, Standard-other Surfaces, White, Solid, 6" Gm 0.671 0711- 16-201 Thermoplastic, Standard-other Surfaces, Yellow, Solid,6"Gm 0.383 0711- 16-231 Thermoplastic, Standard-other Surfaces, Yellow, Skip, 6" Gm 0.274 Section 0003 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 60.000 0632- 7- 1 Signal Cable- New or Reconstructed Intersection,furnish & Installpi 1.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 2.000 0634- 4-600 Span Wire Assembly, Remove- Poles Remain Pi 1.000 0635- 2- 11 Pull & Splice Box, F&i, 13" X 24" Cover Size Ea 6.000 0639- 1-112 Electrical Power Service, F&i, Overhead Meterpurchased by Contractor From Power Companyas 2.000 0639- 2- 1 Electrical Service Wire, Furnish & Install Lf 40.000 0639- 3- 60 Electrical Service Disconnect, Remove- Pole or Cabinetto Remainea 2.000 0641- 2- 12 Prestressed Concrete Pole, F&i, Type P-ii Service Pole Ea 2.000 0643-600- Strain Pole, Wood, Remove Ea 3.000 0649- 21- 10 Steel Mast Arm Assembly, Furnish and Install, Single Arm60`ea 1.000 0649- 21- 21 Steel Mast Arm Assembly, Furnish and Install, Single Arm78`ea 1.000 0650- 1- 11 Vehicular Traffic Signal, Furnish & Install Aluminum, 1section, 1 Wayas 14.000 0670- 4- 1 Intersection Control Beacon Controller Assembly,furnish & Installas 2.000 0715- 1- 12 Lighting Conductors, F&i, Insulated, No.8 - 6 Lf 342.000 0715- 5- 32 Luminaire & Bracket Arm- Galv Steel, Furnish & Install Newluminaire and Arm on New/existing Poleea 2.000 0715-500- 11 Pole Cable Distribution System, Furnish and Installalternate System, Conventionalea 2.000

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete.
Division 10 - Specialties, Signage.
Division 31 - Earthwork, Earth Stripping and Stockpiling, Grading, Earthwork Methods, Riprap.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings.
Division 33 - Utilities.
Division 34 - Transportation, Guideways/Railways, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents