Similar Projects
Phillips Park Splash Pad
New Construction
Bidding
College Park, GA 30337

Restoration Project for Chat GA Hwy 20 Trail Access
Renovation
Bidding
Sandy Springs, GA 30350

Heritage Park Improvements Restrooms
New Construction - 617 SF
Post-Bid
Sandy Springs, GA 30328

Cora Robinson Park Improvements Project
Post-Bid
Fairburn, GA 30213

Tennis Court Resurfacing Project
Results
Less than $19,809 est. value
Milton, GA

River Park Site Improvements
Results
East Point, GA 30344

Construction of Morton Road Community Park
Construction
Less than $1,700,000 est. value
Johns Creek, GA 30022

Hapeville CDBG Park Improvements
New Construction
Bidding
Hapeville, GA 30354

Skatepark Design Build
New Construction
Post-Bid
Union City, GA

Brady Recreation Center Play Area Improvements
Results
Less than $76,888 est. value
Atlanta, College Park, GA 30337

Colonial Hills Unity Park Site Improvements
Renovation
Bidding
East Point, GA 30344

Construction Manager at Risk-Hurt Park Improvement
Results
Less than $850,000 est. value
Atlanta, GA 30303

Cauley Creek Park Multi-Use Trail Phase 1
Results
Johns Creek, GA 30097

Egan Park Site Improvements
Results
Atlanta, East Point, GA 30334

Tennis Court Resurfacing For North Springs High School
Results
Atlanta, GA 30328

Reported 01/25/2020 12:00 AM
Project Title

Colonial Hills Unity Park Phase 1 Renovations

Physical Address View project details and contacts
City, State (County) East Point, GA 30344   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for the renovation of a park facility with a playground. Components include a 2,700 square foot (SF) playground renovation with surface replacement and new drainage, a granite veneer seat wall, concrete plaza, site furniture relocation and sidewalk paths including an ADA accessible route, and several poured in place concrete cheek walls with stairs. The geotechnical report included in this manual provides instruction on the remediation of an existing culvert stream crossing. This project is to include the work to remediate the culvert, reface it with a granite veneer and provide paving and handrail/guardrail on the surface. The Work Consists of: 1. Erosion Control 2. Demolition 3. 2,700 SF Playground Renovation 4. Remediated Culvert/Footbridge 5. Grading and Drainage 6. Concrete Paving 7. Site Furnishing Relocation 8. Granite Veneer Seat Wall 9. Poured in Place Concrete Cheek Walls 10. Turn Down Slabs

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents