Similar Projects
Phase 3 School Bond Renovation
Renovation, Demolition
Conception
Arlington, TX 76010

Phase 4 School Bond Renovation
New Construction, Renovation, Addition
Conception
Arlington, TX

Wisdom Academy Phase I
New Construction - 12,600 SF
Design
$1,000,000 est. value
Carrollton, TX 75006

Maintenance Facility Project
New Construction
Design
$10,610,000 est. value
El Paso, TX

Robert Road ES and Schultz JH Renovation and Addition
Renovation, Addition
Bidding
$4,200,000 est. value
Hockley, Waller, TX 77447

Compass Rose Harvest
Renovation - 45,000 SF
Bidding
$3,262,500 est. value
Bastrop, TX 78602

Renovation of Haslet Elementary for Disciplinary Alternative Education Program
Renovation - 69,600 SF
Post-Bid
$4,200,000 est. value
Haslet, TX 76052

Harmony Science Academy Lubbock - Relocation
Renovation - 67,000 SF
Post-Bid
Less than $5,000,000 est. value
Lubbock, TX 79407

Construction Manager at Risk Services for Construction of A New Elementary School
New Construction
Results
$21,485,000 est. value
West, TX 76691

Serving Line and Kitchen Equipment Renovation
Renovation
Results
$545,500 est. value
Texarkana, TX 75503

Elementary No. 29 - Alternates Proposal
New Construction - 116,450 SF
Construction
Less than $25,823,400 est. value
Humble, TX

Hunters Creek Elementary School Replacement
New Construction - 108,000 SF
Construction
Less than $22,000,000 est. value
Houston, TX 77024

Country Place Elementary School Improvements
Renovation
Pending Verification
Carrollton, TX 75006

Freeman Elementary School Renovation
Renovation
Pending Verification
Irving, TX 75063

Phase 5 School Bond Renovation
Renovation, Addition
Conception
Arlington, TX

Last Updated 01/06/2022 01:37 PM
Project Title

STPA Wing Construction

Physical Address View project details and contacts
City, State (County) Edinburg, TX   (Hidalgo County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Feasibility Study
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Elementary School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents