Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Access Control Point Program Design Build II -- RFI(2)
Design

USPS IQ JOC - Alabama
Renovation
Bidding
$10,000 to $10,000,000 est. value

USPS IQ JOC - Alabama
Renovation
Bidding
$10,000 to $10,000,000 est. value

Two-Phase South Region Unrestricted MATOC, Mobile District AOR
Post-Bid
$100,000,000 to $250,000,000 est. value

Two-Phase South Region Unrestricted MATOC, Mobile District AOR
Post-Bid
$100,000,000 to $250,000,000 est. value

Construction of Pavilion at Mel Roberts Park
New Construction, Demolition - 1,120 SF
Results
Foley, AL

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Renovation of 119 Lafayette Street South
Renovation
Post-Bid
$1,000,000 to $2,000,000 est. value
Lafayette, AL 36862

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

New Network Room at 700 Whispering Pines Road
Renovation
Post-Bid
Daphne, AL 36526

Renovations to the PHA Office
Renovation
Post-Bid
Prattville, AL 36067

Reported 01/28/2021 12:00 AM
Project Title

Facility Repair & Renewal (FRR) (MATOC) Phase 1

Physical Address View project details and contacts
City, State (County) State-Wide: AL, AZ, CT, DC, DE, FL, GA, IL, IN, KY, MA, MD, ME, MI, MN, NC, ND, NH, NJ, NM, NY, OH, PA, RI, SC, SD, TN, TX, UT, VA, VT, WI, WV
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value Less than $450,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To award a Firm-Fixed Price (FFP) Construction Multiple Award Task Order Contract (MATOC) with design/build capabilities in support of the Facility Repair & Renewal (FRR) Program. The FRR program provides rapid response for facility repair, renovation, conversion, and alteration; and facility subsystem additions, construction, equipment procurement/installation at Government installations and facilities covering the following locations: Contiguous United States to include the District of Columbia; Non-Contiguous United States including Alaska, Hawaii, U.S. Territories; Kuwait, Qatar, United Arab Emirates (UAE), Yemen, Iraq, Saudi Arabia, Egypt, Afghanistan, Indonesia, Japan, Korea, Guantanamo Bay, Azores, Germany, Kwajalein, Spain, Italy, Israel, Poland, Turkey, Greenland, England, Belgium, the Netherlands, Diego Garcia, and Australia. (Attachment 12) Other foreign jurisdictions outside the Continental United States may be added to the geographic scope of the Base MATOC if deemed appropriate after an analysis of relevant statutes and regulations, including the competition in contracting act, and approval of a FAR Part 6 J&A for an out-of-scope change if appropriate, and analysis of international agreement terms between the United States and the respective foreign jurisdiction. Due to the need for expeditious repairs, this will be a Two-Phase Design Build construction contract. Services include facility repair, renovation, conversion, alteration, additions, construction, and equipment procurement / installation at Government installations and facilities. The Contractor is required to survey the problem areas, evaluate and recommend solutions, develop and implement work plans in a timely manner within negotiated costs, and provide the repair/renewal/construction efforts to support the design solution. Task Orders under this MATOC are intended to provide quick response for facility repair, renovation, conversion, alteration, additions, construction, and the procurement / installation of equipment at Government installations and facilities.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents