Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

2022 Storm Sewer
Infrastructure
Bidding
$119,000 est. value
Marion, IA

Ellis Harbor Sidewalk Repairs Phase 2
Renovation
Bidding
Less than $130,000 est. value
Cedar Rapids, IA 52405

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Cedar Valley Nature Trail Rehabilitation
Infrastructure
Post-Bid
$180,000 est. value
Ely, IA

6th Street SE from 4th Avenue to 6th Avenue
Results
$950,000 est. value
Cedar Rapids, IA 52401

2021 Curb and Gutter Rehabilitation
Infrastructure
Results
Less than $890,000 est. value
Cedar Rapids, IA 52405

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Business 30 Sidewalk Improvements - Lisbon
Infrastructure
Post-Bid
Lisbon, IA

Derecho Sidewalk, Driveway and Miscellaneous Pavement Repair
Infrastructure
Results
$350,000 est. value
Cedar Rapids, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Business 30 Resurfacing and Improvements
Infrastructure
Results
Mount Vernon, IA

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

Hiawatha Turtle Creek Park Phase 2
Infrastructure
Results
Hiawatha, IA

Last Updated 11/17/2021 03:37 AM
Project Title

PCC Sidewalk/Trail - Lindale Trail

Physical Address View project details and contacts
City, State (County) IA   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Lindale Trl Ext from existing trail along &under Blairs Ferry Rd. Along abandoned Rail to Council Street NE 13.00 Each Aprons 4.10 Acre Clearing & Grubbing 1.00 Lump Sum Construction Survey 28.00 Linear Foot Culvert Pipe 1,086.00 Linear Foot Curb & Gutter p.c.c. 726.00 Square Yard Drives, p.c.c. 14,817.00 Cubic Yard Excavation Class 10 2,759.00 Cubic Yard Excavation Class 22 429.00 Linear Foot Fence, Chain Link 95.00 Ton Granular Shoulders, Type b 9.00 Each Intakes & Manholes/Utility Access 1,490.00 Cubic Yard Modified Subbase 5.10 Acre Mulching 4.00 Each Patches By Count 242.00 Square Yard Patches, Full-Depth 276.00 Station Pavement Markings 1,132.00 Square Yard Pavement, p.c.c. 15.90 Cubic Yard Pavement, p.c.c. (Furnish Only) 285.60 Square Yard Pavement, p.c.c. (Place Only) 134.00 Linear Foot Posts, Metal, For Signs 133.00 Linear Foot Rail, Metal 5,487.00 Square Yard Recreational Trail, Hma 1,367.00 Square Yard Recreational Trail, Pcc 3,460.00 Square Yard Removal Of Pvmnt/Drives/Sdwk 26.00 Square Foot Retaining Wall 10.20 Acre Seeding & Fertilizing 843.00 Linear Foot Sewer, Storm 116.00 Station Shoulder Finishing 1,015.00 Square Yard Sidewalk, p.c.c. 46.00 Square Foot Signs, Type a 378.00 Linear Foot Subdrain 24.00 Ton Surfacing, Crushed Stone 1,281.00 Linear Foot Temp. Barrier Rail 5,526.00 Cubic Yard Topsoil, Strip/Salvage/Spread 1.00 Lump Sum Traffic Signalization 24.00 Each Trees

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents