Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

East 2nd St. Streetscaping
Infrastructure
Bidding
Davenport, IA 52801

Facilities Management North Parking Lot - Phase 2
Infrastructure
Bidding
Cedar Falls, IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Post-Bid
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Post-Bid
Ankeny, IA 50023

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

Valley Junction Levee Trail Connection
Infrastructure
Bidding
West Des Moines, IA

Gilbert Court Sidewalk Infill
Post-Bid
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

Trailhead Plaza at Creekside Cross and Flow Trails
Infrastructure
Bidding
Coralville, IA 52241

High School Parking Lot
Post-Bid
Waverly, IA

Lindale Trail Phase II from I-380 to Council Street North East
Conception
$1,200,000 est. value
Cedar Rapids, IA

Public Housing Pavement Repair
Infrastructure
Bidding
$147,000 est. value
Iowa City, IA

6th Street SE from 4th Avenue to 6th Avenue
Post-Bid
$950,000 est. value
Cedar Rapids, IA 52401

Last Updated 06/01/2021 06:14 AM
Project Title

2021 Curb and Gutter Rehabilitation

Physical Address View project details and contacts
City, State (County) Cedar Rapids, IA 52405   (Linn County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $890,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Generally consists of curb and gutter repair and replacement project to prepare streets for milling and overlay (by others). This project includes approximately 5,400 LF of Curb and Gutter, 2,100 SY of Pavement Removal, 575 SY of 8" PCC, 400 SY of Full Depth Patching, 1,290 CY of Excavation, and 400 SY of Driveway Pavement located at J Avenue NW from 11th St NW to 13th St NW; 9th Avenue SW from Cleveland St SW to 8th Ave SW; 6th Avenue SE from 16th St SE to 17th St SE; 8th Avenue SE from 14th St SE to 16th St SE; Blake Boulevard SE from Forest Drive SE to Grande Ave SE.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents