Similar Projects
WWTP Liner Replacement
Infrastructure
Bidding
$559,000 CJ est. value
Elgin, IA 52141

Reed Bed Expansion and EQ Basin Line Replacement Contract 1-2023
Infrastructure
Bidding
$750,000 CJ est. value
Oelwein, IA 50662

Natural Gas Fuel Lines, Ames
Renovation
Sub-Bidding
$100,000 CJ est. value
Ames, IA 50010

Elk Horn Pool House
Infrastructure
Sub-Bidding
$244,320 CJ est. value
Elk Horn, IA 51531

Sioux City Elec Maint Bld Water Softener Replacement
Alteration
Post-Bid
Hinton, IA 51024

Cobblestone Hotel & Suites - City of Ottumwa
New Construction, Infrastructure
Post-Bid
$9,900,000 CJ est. value
Ottumwa, IA 52501

Lake Wapello State Park Boy Scout Pond Outlet Replacement
Renovation, Infrastructure
Results
Drakesville, IA 52552

High Street Storm Sewer Improvements Project
Infrastructure
Results
$312,437 CJ est. value
West Des Moines, IA 50265

2023 Street Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Massena, IA 50853

Install Multiplex Water Softener
Alteration
Post-Bid
$250,000 to $500,000 est. value
Ames, IA 50010

Springreen Apartments Water Main Improvement Project
Infrastructure
Results
$113,984 CJ est. value
Asbury, IA 52002

WWTP Vertical Loop Reactor Replacement Air Piping
Infrastructure
Post-Bid
$390,000 CJ est. value
Carroll, IA 51401

Wastewater Reclamation Facility Belt Filter Press Improvements
Renovation
Results
$1,991,800 CJ est. value
Des Moines, IA 50317

2022 Stormwater Intake Repair Program
Infrastructure
Post-Bid
$295,867 CJ est. value
Des Moines, IA 50315

VA District - Phase 1 Improvements
Infrastructure
Results
$3,346,000 CJ est. value
Knoxville, IA 50138

Last Updated 07/10/2023 03:04 PM
Project Title

Tile line Replacement under Highway U.S. 65 in Story County

Physical Address View project details and contacts
City, State (County) Ames, IA 50010   (Story County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $38,500 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Special Requirements and Bidding Information: Story County, Collins Township, T-82N-R21W, Section 26. Project Location: Mile Marker 103.05 and Station 1248+38+/- The damaged tile in need of repair is approximately 10-12 feet deep straight down from the edge of the HMA shoulder and broke near the south wall of the box culvert. The fore slope of the west ditch will need to be dug out and shoring placed to stabilize the existing subgrade for repairs to be made. Repaired tile section shall be connected to existing Tile at a location where the existing tile is not damaged and clean connection can be made. Tile shall be replaced to the outlet at the existing box culvert. All disturbed shoulder and fore slope shall be restored with 95 percent compaction and reseeded with rural seed requirements. 1. Approx. 50 feet of solid wall 6-inch plastic pipe. Joints shall be wrapped with engineering fabric. 2. Standard Road Plan DR-306 can be referenced for attaching outlet to box culvert structure. 3. Standard Road Plan EC-103 shall be followed for restoring disturbed foreslope. 4. Table 2601.03.1 shall be referenced for reseeding Right of Way. 5. Shoring shall be required 6. Standard Road Plan for Traffic Control shall follow TC-202. 7. Shoulder shall be restored to original condition if removal is needed. 8inches H.M.A mix or 7" PCC required for repair. Shoulders of U.S 65 shall not be used for parking or storage of non-essential vehicles. Until the contract is awarded the sole point of contact for this project is Julie Brown, julie.brown@iowadot.us. Question Cuttoff Date & Time 6/22/2023 02:00:00 PM (ET) DOT estimated start date is to begin after bid award with completion as close to October 31, 2023. It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. All questions related to this project may be submitted through the IonWave Bid system through the cut off period for question submissions. It is the intent of the Iowa DOT to award the contract to the responsible bidder whose submitted quotation is the most advantageous to the Iowa DOT, cost and other factors considered. Other factors include, but are not limited to: meeting or exceeding mandatory requirements, proposed staffing, and meeting required time schedule. IADOT -Tile line replacement under Highway U.S. 65 in Story County

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents