Similar Projects
I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 224 at SE Monroe St
Infrastructure
Design
$3,077,537 CJ est. value
Estacada, OR 97023

Request For Qualifications For Harvey Street Improvements
Infrastructure
Bidding
$3,266,000 CJ est. value
Milwaukie, OR 97222

RFP - Affordable Housing Construction Grant (Construction Excise Funds)
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Milwaukie, OR 97222

Expansion of the Happy Valley Library
Addition, Demolition, Infrastructure - 10,738 SF
Sub-Bidding
$6,500,000 CJ est. value
Clackamas, OR 97015

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

RFP Engineering - Services for the Clackamas Area Interceptor Improvements Project
Infrastructure
Post-Bid
$40,000,000 CJ est. value
Oregon City, OR 97045

US26: SE Kelso Rd - Frog Lake Sno Park Section of the Mt Hood and Warm Springs Highway (Rt. No. US26) beginning in Sandy
Infrastructure
Results
$500,000 to $1,000,000 est. value
Sandy, OR

River Grove Elementary School Replacement - Site Package Project
Infrastructure
Results
Lake Oswego, OR 97035

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Lake Oswego Aquatic Rec Center
New Construction, Infrastructure - 34,060 SF
Construction
$30,000,000 CJ est. value
Lake Oswego, OR 97035

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Frog Pond Oaks Subdivision
New Construction, Infrastructure
Pending Verification
$17,000,000 CJ est. value
Wilsonville, OR 97070

Last Updated 05/22/2023 04:32 PM
Project Title

Milwaukie Bay Park 50% DD Pricing Narrative

Physical Address View project details and contacts
City, State (County) Milwaukie, OR 97222   (Clackamas County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $325,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Milwaukie Bay Park Summary: Phase 3 of Milwaukie Bay Park improvements, including: new restroom, interactive water feature, playground, picnic area, pathways, plantings, new stormwater management infrastructure, and a gathering space. Applicant: Heather Koch, NCPRD Address: 11211 SE McLoughlin Blvd File: NR-2022-001 (primary file); WG-2022-001; VR-2022-006; DR-2022-001 Staff: Senior Planner Vera Kolias ___________________________ Lease Crutcher Lewis is the awarded Construction Manager / General Contractor and is seeking 50% DD Budget Pricing. Plans call for the Selective Demolition and Reconstruction of existing Milwaukee Bay Park. Along the OR 99E right-of-way, approximately 7,600 square feet of concrete sidewalk will be removed to accommodate new sidewalk alignment. The existing traffic signal mast arm and cross walk sensor at Monroe Street will need to be relocated out of the proposed sidewalk corridor. The three light bollards at the north end of the trail will also need to be removed/relocated. Near the Monroe Street intersection, the existing artwork, stairs, boulders, paving, and light fixture will be removed and salvaged for Owner. Approximately 200 linear feet of abandoned gas line and 2,600 square feet of asphalt trails will also to be removed. Along the southwest corner of the site, the newly constructed Field Inlet and approximately 110 linear feet of 12inch ductile iron storm pipe will be removed. Refer to the Electrical Narrative for additional utility demolition associated with power. Water Service It's anticipated that a new 2-inch potable water service with double check will be required to serve the restroom facilities, water feature, and drinking fountains. Another reduced pressure (RP) backflow device is anticipated to be required for the water feature. An existing 10-inch DIP is located along the park frontage within the curb line, so no roadway patch work will be necessary for this new service. It is estimated that 25 LF of 2-inch water line will be necessary to serve the restroom and water feature control (assumed to be in the restroom building). An additional 10 LF of 1/2 -water line will be necessary for the drinking fountain in front of the restroom building.

Details

Acre, 4 Acre.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents