Project Title | Construction of the North 1st Avenue Bridge Over the BNSF Railroad |
Physical Address | View project details and contacts |
City, State (County) | Barstow, CA 92311 (San Bernardino County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected January 2023 |
Bids Due | View project details and contacts |
Estimated Value | $30,725,220 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of August 25th, 2022, project has not been awarded. Project is expected to be awarded sometime after September 7th. This construction project is located on North 1st Avenue in the City of Barstow. The City of Barstow (City), in cooperation with the California Department of Transportation (Caltrans) and the San Bernardino County Transportation Authority (SBCTA), is proposing to replace the existing two-lane North 1st Avenue bridge over the BNSF railyard with a new two-lane bridge including 8-foot shoulders and an 8-foot sidewalk. The southern terminus of the project would be just south of White Street and the northern terminus would be at Riverside Drive. The existing bridge would be demolished and removed. The North 1st Avenue Bridge Replacement Project (Project) consists of, but is not limited to, the following components: Construction of new 7-span post-tensioned concrete box girder bridge on seat type abutments and deep foundations. Removal of existing 29-span steel truss and steel / timber girder bridge across the BNSF railyard. Removal of existing building foundations. Construction of new 380-foot-long soil nail retaining wall. Realignment of North 1st Avenue approach roadway and intersections. Associated work includes utility relocation, drainage improvements, lighting improvements, pavement construction, curb ramps, sidewalks, and improvements to Del Taco parking lot. Liquidated Damages 13,500 Per Calendar Day of Delay Online Q&A Yes Q&A Deadline 06/10/2022 4:00 PM (PDT) "Base Bid" estimate for this project is approximately Forty Three Million, Three Hundred and Seven Thousand dollars ($43,680,000). Notice To Proceed: September 2022 |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |