Similar Projects
Blue Ridge Parkway
Term Contract, Infrastructure
Bidding
$2,000,000 to $5,000,000 est. value
VA

Necklace Phase One and Stream Restoration
Infrastructure
Bidding
Fairfax, VA

Concrete Pipe
Post-Bid
Lebanon, VA 24266

Dry Run Bank Stabilization Project
Infrastructure
Post-Bid
Covington, VA

NASA Wallops Beach Renourishment (Backpassing)
Results
$10,000,000 to $25,000,000 est. value
Wallops Island, VA 23303

Design-Bid-Build, P653 Dry Dock Flood Protection Improvements
Results
$25,000,000 to $100,000,000 est. value
Portsmouth, VA

Schneider Branch Segment 1 (CU82-0002) at Sully Road Stream Restoration
Infrastructure
Bidding
VA

Plastic Culvert Pipe
Infrastructure
Post-Bid
Rockville, VA 23146

Construction of Ashville Park Drainage Improvements Phase I
Results
Virginia Beach, VA

Pipe Rehabilitation
Infrastructure
Bidding
Penhook, VA 24137

Double Wall Polyethylene Pipe
Infrastructure
Post-Bid
King George, VA 22485

Richmond Office 10Th Street Retaining Wall and Water Infiltration Construction
Results
$100,000 to $250,000 est. value
Richmond, VA

Pipe Replacement under Route 695
Infrastructure
Bidding
$1,249,000 est. value
VA

Wrightsville Community Revitalization - Infrastucture
Infrastructure
Post-Bid
VA

Tuckahoe Park Stream Restoration and Sewer Replacement and Comet Road Pipe Rehabilitation/Replacement
Results
Henrico, VA 23294

Last Updated 03/21/2022 09:54 AM
Project Title

Almond Creek Interceptor Creek Crossing Replacement and Creek Stabilization

Physical Address View project details and contacts
City, State (County) Richmond, VA   (Chesterfield County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goal: MBE/ESB - 15%. The work to be done under this Contract includes the following, along with all appurtenant work including but not limited to: the installation of 30-inch ductile iron sewer pipe by both guided boring and open-cut method, manholes, bulkheads, connection to an existing siphon inlet structure, bypass pumping of sewage, stream flow diversion, dewatering, soil and erosion measures during construction, excavation and backfill, installation of reinforced concrete encasement around the sewer pipe, sewer removal and abandonment, creek stabilization which includes gabions, geotechnical fabric, graded gravel, and rip rap captured between gabions, and bank stabilization which includes gabions, geotechnical fabric, graded gravel, and rip rap over a graded slope. These work elements include the protection of existing structures and utilities intended to remain, bypass pumping, dewatering and temporary services to maintain sanitary sewers in service at all times and performing the work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents