Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

ADA Curb Ramp Improvements-Westside - Part 1- Section 3 - PQ Horizontal
Post-Bid
Less than $1,158,847 est. value
Jacksonville, FL 32099

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

SW 27th Multi-Use Path
Results
Less than $367,000 est. value
Gainesville, FL

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Salt Lake (Entry Improvements)
Post-Bid
Less than $75,000 est. value
Mims, FL 32754

City of Freeport - Pool Parking Lot Paving
Results
Less than $39,266 est. value
Freeport, FL

City of Plant City Sidewalk Improvements
Post-Bid
Plant City, FL 33564

Concrete Horizontal Cutting on Public Walking Surfaces - ADA Compliance
Results
Less than $100,000 est. value
Tampa, FL 33601

Osceola Technical College (TECO) Parking Lot Expansion
Post-Bid
Kissimmee, FL 34744

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

Sidewalk Replacement at Public Housing Property
Post-Bid
Eustis, FL 32726

Six Mile Cypress Shared use Path from Winkler Avenue to Challenger Boulevard
Results
Less than $145,666 est. value
Fort Myers, FL 33901

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Last Updated 02/22/2021 01:00 AM
Project Title

Miscellaneous Public Infrastructure Engineering Projects

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32301   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $168,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project No. 1 Edison Leak Remediation The work of this project consists of furnishing all labor, equipment and materials for construction of a foundation underdrain system along the east wall of the building including an outfall pipe along with the removal and relocation of utility pipe penetrations through the east wall which includes waterproofing the exterior of the eastern wall as directed in the plans. Project No. 2 Centerville Road Sidewalk Reconstruction The work of this project consists of furnishing all labor, equipment and materials for re-construction of sidewalk along Centerville Road from north of Teddy Lane to south of Woodgate Way including demolition of existing sidewalk, tree mitigation, construction of new sidewalk, and sidewalk curb wall. Project No. 3 Walden Road Sidewalk Improvements The work of this project consists of furnishing all labor, equipment and materials for construction of sidewalk along Walden Road from north of Adiron Way to south of Mahan Drive (SR 10) including tree removal, construction of new sidewalk, ditch improvements, crosswalk, and signing and pavement markings.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents