Similar Projects
Demolition of Falmouth Wastewater Treatment Facility Wind Energy Facility
Demolition
Bidding
Falmouth, MA 02540

Demolition of the Existing Boys Locker Room
New Construction, Demolition
Bidding
$710,000 est. value
Scituate, MA

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Sources Sought Notice for Bureau of Indian Affairs (BIA) Demolition Indefinite
Demolition
Post-Bid
$25,000 to $200,000,000 est. value

Dismantle 9 Ft - 64 Ft Modular Buildings
Demolition
Results
Less than $150,000 est. value
Rehoboth, South Dartmouth, MA

Removing and Demolishing the Old Leach Tank and Shed
Results
Less than $14,170 est. value
Hull, MA 02045

Demolition of Old Water Fountains and Replacement - General Bid
Demolition
Bidding
$476,000 est. value
Dorchester, MA

Demolition of Existing Safety Complex
Demolition
Post-Bid
$50,000 est. value
Westhampton, MA 01027

King Street Building Demolition
Results
$32,500 est. value
Littleton, MA

FY2022 Ashfield Middle School Modular Classrooms Demolition and Installation
New Construction, Demolition, Term Contract
Bidding
$500,000 est. value
Brockton, MA

Demolition of 13 and 15 Parker Street
Demolition
Post-Bid
$50,000 est. value
Ware, MA

Demolition of 2 Residential Properties
Demolition
Results
Less than $75,000 est. value
Pittsfield, MA 01201

House Demolition Services
Demolition
Bidding
$200,000 est. value
Plymouth, MA 02360

Abatement and Demolition of Former Boiler Building and Steam Tunnels
Post-Bid
$625,000 est. value
Westfield, MA

Demolition of Building at 24 Caller Street
Demolition - 6,000 SF
Results
Less than $110,000 est. value
Peabody, MA 01960

Reported 04/08/2022 12:00 AM
Project Title

Demolition of Existing Sludge Collection System

Physical Address View project details and contacts
City, State (County) Walpole, MA   (Norfolk County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $800,000
Plans Available from Engineer - 03/02/22
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. Demolition of existing sludge collection system and sludge pumps, and installation of new submersible sludge pumps with associated piping, valves, instrumentation and electrical components. Modification to backwash piping and installation of concrete fill within Waste Basins along with a new tank wash-down system.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents