Similar Projects
Pollard Mills Infrastructure Phase 2
Infrastructure
Bidding
Ashland, KY

Lawn Maintenance Services 2022
Alteration
Bidding
Danville, KY 40422

Grimes Avenue Basin and Landscaping
Post-Bid
Owensboro, KY 42303

Middlesboro, KY Channel Clearing
Post-Bid
$1,000,000 to $5,000,000 est. value
Middlesborough, KY

8010 Mimosa Drive Bank Repair
Results
$50,000 to $100,000 est. value
Louisville, KY 40203

ELR 72 Culvert Replacement - Dodsworth Lane
Results
KY

Lawn Maintenance & Bush Hog Services
Alteration
Bidding
KY

Grass Cutting for Boone County Parks Department
Term Contract
Post-Bid
KY

Stober Road Drainage Improvement
Results
Louisville, KY

Hopkinsville Surface & Stormwater Utility - Rose Acres Drainage Improvements - Cline Property Detention Pond
Infrastructure
Bidding
Hopkinsville, KY

Landscaping Maintenance Services
Term Contract
Post-Bid
Paducah, KY

Main Line Drain Replacement
Results
Henderson, KY 42420

Renew/Modernize Facilities - Campus Enabling (Phase 2) Rose Street Beautification
Infrastructure, Alteration
Bidding
Lexington, KY 40502

8018 South Third Street Road - Drainage Improvement and Building Underpinning
Post-Bid
Louisville, KY 40214

Culvert Replacement
Results
KY

Last Updated 03/01/2022 02:35 AM
Project Title

Judy & Freddie Moore AML Reclamation

Physical Address View project details and contacts
City, State (County) Langley, KY 41645   (Floyd County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Judy’s slide is located at coordinates Lat 37° 29' 44.94", Long 82° 47' 00.83" and Freddie’s slide is coordinates Lat 37° 29' 42.58", Long 82° 47' 01.81". On April 4, 2018 a portion of the hillside at Judy Moore’s residence became unstable and slid into the creek. Then on April 12, 2021 at Freddy Moore’s residence (Judy’s neighbor, no relation) became unstable and slid into the creek (which has been removed from the creek by the property owners). The slide area is approximately 20 feet by 20 feet at Judy’s residence and 40 feet by 50 feet at Freddy’s residence. Judy and Freddie Moore are concerned about the creek being blocked by the slides, if the slides get any bigger. Also, they are concerned about the safety of their homes, if the slides are not addressed. To address this concern, the slide areas will be stripped to bedrock to remove the threat of more sliding. All excavated earthen material will be placed on Rodney Moore’s property as shown on the plan view. A temporary access road will be constructed using geogrid and a temporary low water crossing will be installed on Freddy’s property, to access the slides as shown on the plan view. All excess material will be removed to the waste area as shown on the plan view. The cost estimate for this work includes plan quantity for the earthwork and additional items for site prep, revegetation, roadway stone, geogrid, and concrete for the driveway access area are included in the cost estimate. In total, the project area encompasses approximately 3.0 acres behind the house of Judy Moore and Freddie Moore as marked on the plans. This project will directly disturb the stream and a permit has been obtained for a temporary low water crossing to access the slides. This project will not address underground mine openings. No trees will be disturbed outside of the unstable landslide area. All areas disturbed by this project will be revegetated by means of the Standard AML Reclamation Seed Mixture. A quantity of Hydro mulching/Hydro seeding has been included to address revegetation of suitable portions of the landslide area following excavation. Cover crop is also provided in order to provide quick vegetative cover on any disturbed areas that will go undisturbed for at least two weeks, but not be ready for application of permanent revegetation. Sediment control will be provided by silk fences or straw bales along the Creek bank and other areas as needed.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents