Similar Projects
GAOA Forest-Wide Cattle Guard Maintenance and Reconstruction
Infrastructure
Design
$1,000,000 est. value
Prineville, OR

Southern Oregon Seismic Slopes Stability
Infrastructure
Design
Less than $8,700,000 est. value
Medford, OR 97501

Grading, Paving and Signals Maxwell Road and North Delta Highway Pedestrian Improvements
Infrastructure
Bidding
$600,000 to $725,000 est. value
Eugene, OR 97401

2022 Project Work - Astoria, Forest Grove and Tillamook Districts
Infrastructure
Bidding
Salem, OR

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

Pothole Repairs
Alteration
Post-Bid
$80,000 est. value
Coos Bay, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

Eckerd Avenue, 2nd Street and Lola Avenue Sewer and Water Line Replacement
Infrastructure
Bidding
$1,400,000 to $1,750,000 est. value
Molalla, OR

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

Deal Street Improvements
Infrastructure
Bidding
$600,000 est. value
Junction City, OR 97448

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

US20 - Warm Springs Road - Harer Junction Section Central Oregon Highway
Infrastructure
Results
$10,000,000 to $20,000,000 est. value

2022 Street Rehabilitation Project
Infrastructure
Bidding
$715,000 est. value
Dallas, OR

Reported 06/30/2022 03:14 PM
Project Title

28th Street: Main St to Olympic St (Springfield)

Physical Address View project details and contacts
City, State (County) Springfield, OR 97475   (Lane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Design Development, Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value $1,716,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Springfield, Oregon. Design plans call for site work for a road / highway; and for paving for a road / highway. Pavement preservation As of October 20, 2020, the project is in design status. Anticipated letting date is July 04, 2020. ODOT - 28th Street: Main St to Olympic St (Springfield) *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents