Similar Projects
Sakura Asian Village
New Construction - 90,000 SF
Conception
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Maple Office Park
New Construction - 23,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Bloomfield Hills, MI 48301

Pine Village - 55 and Older Development
New Construction, Demolition - 170,149 SF
Design
$12,000,000 est. value
Madison Heights, MI 48071

Virginia Tile - Flagship Showroom
Build-Out - 18,000 SF
Post-Bid
Troy, MI

DPW Office Improvement Project
Post-Bid
Berkley, MI 48072

Office Relocation and Site Work Fell Center
Results
Pontiac, MI 48342

Live Well Homes
Renovation, Addition - 21,000 SF
Construction
$900,000 est. value
Royal Oak, MI 48067

Varsity Shop Redevelopment
New Construction, Demolition - 27,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Birmingham, MI 48009

Telegraph Road Office
New Construction - 10,308 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Bloomfield, MI

West Eleven Office Park
Renovation - 697,000 SF
Pending Verification
$2,000,000 to $3,000,000 est. value
Southfield, MI 48034

Hunter House
New Construction
Design
Birmingham, MI 48009

Grob Systems Office Upgrades
Renovation
Construction
Troy, MI 48083

Galleria Officentre
Addition - 95,500 SF
Pending Verification
$8,500,000 est. value
Southfield, MI 48076

Morgan Place Office Building
New Construction - 2,420 SF
Design
$500,000 to $1,000,000 CJ est. value
Novi, MI 48377

Truck-Lite
New Construction - 40,000 SF
Construction
$4,000,000 est. value
Southfield, MI 48076

Last Updated 09/01/2020 03:47 PM
Project Title

Brandon Township Office Building Facelift

Physical Address View project details and contacts
City, State (County) Ortonville, MI 48462   (Oakland County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing masonry on the south side of the building across the front. Remove existing glass in the commercial style windows because of broken seals. Remove existing landscaping. Remove metal panels above windows, fill in for new scratch coat and stone. Clean up and haul away all debris. Remove existing mechanicals and signage to replace as necessary. Install tar paper backing on walls where the masonry has been removed. Replace the existing 3 light fixtures with 3 or more LED fixtures. Install new window flashing around commercial window frames. Replace glass inside of commercial window frames with new thermal pane energy efficient glass. Install wire mesh for stone and scratch coating. Install cultured stone per allowance ($18.00 per square foot materials and labor). Install a new 7’ deep by 10’ wide porch with maintenance free shingles and soffits to match existing. Move automatic door opener and install tapered sidewalk to accommodate a 5’ walkway. Include two 2’ x 2’ craftsman style posts tapered top to bottom with stone up 32” from the bottom of the porch and remainder of post to match soffit material.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents