Similar Projects
RH Store (Restoration Hardware)
New Construction, Demolition - 54,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Birmingham, MI 48009

Amazon Logistics Distribution Center - Unit 5 (Last Mile Delivery Center)
Renovation - 87,000 SF
Conception
South Lyon, MI 48393

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Sakura Asian Village
New Construction - 47,477 SF
Design
$50,000,000 to $60,000,000 est. value
Novi, MI 48375

Box Lunch #4704
Build-Out
Bidding
Auburn Hills, MI 48326

Meijer Store #109: Addition
Addition - 4,294 SF
Bidding
Commerce, MI 48390

Lenscrafters #5594 - Tel Twelve
Renovation - 3,046 SF
Sub-Bidding
Southfield, MI 48034

Total Wine & More #2602
Build-Out - 27,983 SF
Post-Bid
Novi, MI 48375

Public Storage - Climate Controlled Warehouse
New Construction - 33,274 SF
Post-Bid
Waterford, MI 48328

Brandon Township Office Building Facelift
Results
Ortonville, MI 48462

Parks Contact Station and Shed
Results
Less than $9,017 est. value
Waterford, MI

Live Well Homes
Renovation, Addition - 21,000 SF
Construction
$900,000 est. value
Royal Oak, MI 48067

Griffin Project - Mixed Use Development
New Construction - 117,347 SF
Construction
$65,000,000 est. value
Royal Oak, MI 48067

Marijuana Retail Facility
Renovation - 13,004 SF
Pending Verification
Royal Oak, MI 48067

The Bloomfield Hills Office Center
New Construction - 75,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Bloomfield Hills, MI 48304

Reported 09/16/2021 07:00 AM
Project Title

Virginia Tile - Flagship Showroom

Physical Address View project details and contacts
City, State (County) Troy, MI   (Oakland County)
Category(s) Commercial
Sub-Category(s) Office, Retail, Warehouse/Storage
Contracting Method
Project Status Building in Operation as of August 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction consists of interior warehouse, offices and retail showroom build-out within existing shell.

Details

Retail, 18,000 SF Build-Out, Office, Warehouse/Storage.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents