Similar Projects
Boston - Roadway, Ceiling, Arch and Wall Reconstruction and Other Control Systems
Term Contract
Bidding
$112,000,000 est. value
Boston, MA 02111

Hooper Street Retaining Wall and Site Improvements
Bidding
Chelsea, MA 02150

Sitework and Accessibility Improvements at Fitchburg State University, Mara Village Residential Complex
Post-Bid
Less than $300,000 est. value
Boston, MA 02210

Walkways to Improve Site Accessibility
Post-Bid
Less than $185,000 est. value
Boston, MA

Repair Fire Alarm System and Repairs to Parking Lot 3 at Boston AFRC, Barnes Bldg, 495 Summer Street, Boston, MA 02210
Results
$100,000 to $250,000 est. value
Boston, MA 02210

Z--Robert Gould Shaw Memorial
Results
$1,000,000 to $5,000,000 est. value
Boston, MA 02108

Linden Street Apartments
New Construction
Pending Verification
Allston, MA 02134

Enterprise-Rent-A-Car
New Construction
Pending Verification
Chelsea, MA 02150

Capital Improvement Project 19-32 for Highway Reconstruction
Post-Bid
Boston, MA

Roadway Surface Sealing Treatments - Liquid DeIcer(W/Chloride)
Term Contract
Results
Boston, MA

Highway Reconstruction in Chestnut Hill Avenue, Paul Place, Quincefield Street, Reservation Road, Trident Street, and Winter Street
Post-Bid
Boston, MA

General Contractor for Signalization and Reconstruction of Congress Street
Results
Less than $1,151,000 est. value
East Boston, MA 02128

Crack Sealing - Asphalt Fiber Reinforced Compound
Term Contract
Post-Bid
Less than $722,580 est. value
Boston, MA

Roadway Reconstruction and Related Work (Including Signals) along a Section of Melnea Cass Boulevard
Results
Less than $19,001,312 est. value
Boston, MA

Crack Sealing - Modified Asphalt Fiber Reinforced Compound
Term Contract
Post-Bid
Less than $103,000 est. value
Boston, MA

Last Updated 01/05/2021 04:28 PM
Project Title

Construction Services - Drainage, Sidewalks and Roadways

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method
Project Status Construction Commenced November 2020, Construction Completion Expected March 2022
Bids Due View project details and contacts
Estimated Value $2,268,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Site Development, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents