Similar Projects
Willow Street Watts Street Central Avenue Utility Road and Traffic Improvements
Infrastructure
Bidding
$4,059,000 est. value
Chelsea, MA

Scheduled and Emergency Highway Maintenance and Repairs at Various Locations
Infrastructure
Bidding
$1,156,172 est. value

Repave the Cabot Bus Garage Facility
Post-Bid
Less than $1,000,000 est. value
Dorchester, MA

Foster Street Paving, North End
Post-Bid
Boston, MA 02100

General Contractor for Signalization and Reconstruction of Congress Street
Results
Less than $1,151,000 est. value
East Boston, MA 02128

Miscellaneous Airfield Pavement Improvements at Logan International Airport
Results
Less than $4,200,000 est. value
East Boston, MA 02128

Construction Services - Drainage, Sidewalks and Roadways
New Construction
Construction
$2,268,000 est. value
Boston, MA

Orient Heights - Phase 3 Roadway Improvements
Construction
$3,150,000 est. value
Boston, MA 02128

Enterprise-Rent-A-Car
New Construction
Pending Verification
Chelsea, MA 02150

Whittier Street Phase 3 Roadway Improvements
Bidding
$2,500,000 est. value
Boston, MA 02120

Capital Improvement Project 21-21 for HighwayReconstruction on Ruggles Street
Post-Bid
Boston, MA

Microsilica Overlay Replacement and Related Work Along Sections of Interstates 90 and 93 (CRC 28)
Results
Less than $23,212,000 est. value
Boston, MA 02108

Repave Hot Mix asphalt (HMA) Pavement
Infrastructure
Bidding
$163,000 est. value
Boston, MA

Deep Roadway Maintenance in all Areas
Post-Bid
Boston, MA

Crack Filling, Pavement Patching
Results
Less than $2,200,000 est. value
East Boston, MA

Last Updated 01/12/2022 09:50 AM
Project Title

Roadway, Ceiling, Arch and Wall Reconstruction and Other Control Systems in Sumner Tunnel DESIGN-BUILD PROJECT

Physical Address View project details and contacts
City, State (County) Boston, MA 02111   (Suffolk County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $111,175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes both design and construction of the rehabilitation of the Sumner Tunnel. This includes, but is not limited to, the rehabilitation of the roadway walls and ceiling of the Sumner tunnel box, circular (arch) section and East Boston boat section. In addition, this Project will upgrade the life safety systems to the current standard, and these include lighting, fire standpipe, CCTV cameras and fire alarm systems.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 09 - Finishes, Ceilings.
Division 21 - Fire Suppression, Fire-Suppression Standpipes.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Conductors and Cables for Electronic Safety and Security, CCTV Communications Conductors and Cables, Access Control, Access Control Interfaces, Access Control Interfaces to Fire Alarm.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents