Similar Projects
Agile Autos
New Construction, Renovation - 3,038 SF
Conception
$500,000 to $1,000,000 CJ est. value
Loganville, GA

Rivian Automotive East Atlanta Megasite Building Vertical Construction / Stanton Springs North
New Construction, Infrastructure - 12,000,000 SF
Conception
$5,000,000,000 CJ est. value
Social Circle, GA 30025

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Grove at Rosebud - Phase 2
New Construction, Infrastructure
Design
$6,000,000 CJ est. value
Loganville, GA 30052

Whataburger / Monroe
New Construction, Infrastructure - 3,746 SF
Bidding
$1,500,000 CJ est. value
Monroe, GA 30655

RFP Construction Manager at Risk - Construction of a New Elementary School and Transportation Facility
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Social Circle, GA 30025

Piedmont Regional Industrial Park Site Grading
Infrastructure
Post-Bid
GA

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2021 Milling and Deep Patching
Results
Monroe, GA

FY 2020 CDBG Storm Drainage and Street Improvements
Infrastructure
Results
Monroe, GA

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Brand Road C-Store / Loganville
New Construction, Infrastructure - 3,237 SF
Construction
$2,227,627 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Lake Carlton Road Townhomes
New Construction, Infrastructure
Pending Verification
$70,000,000 CJ est. value
Loganville, GA 30052

Alcovy River Gravity Sewer - City of Monroe
Infrastructure
Conception
$4,000,000 CJ est. value
Monroe, GA 30655

Last Updated 01/19/2023 04:15 PM
Project Title

Treweeke Self-Storage

Physical Address View project details and contacts
City, State (County) Monroe, GA 30656   (Walton County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Warehouse/Storage
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a mini-storage facility and an office/warehouse. As of January 2023, this project is abandoned, all documents have been expired through the city. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 68,250 SF - Office, 20,000 SF New Construction, Warehouse/Storage, 48,250 SF New Construction, Warehouse/Storage, Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents