Similar Projects
Last Updated | 02/23/2023 05:23 PM |
Project Title | Estancia High School Theater - Remaining Bid Packages #12-#44 |
Physical Address | View project details and contacts |
City, State (County) | Costa Mesa, CA 92627 (Orange County) |
Category(s) | Education, Entertainment/Recreation, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development, Theaters/Auditoriums |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $33,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cut-off for RFIs 02-23-23 at 2:00 PM Project Number - 2293 Project Description: Flint has been selected as the General Contractor for this Lease-Leaseback project. The project consists of the construction of a new 28,000 SF, 355-Seat Theater, and associated site improvements at Estancia High School. This new facility will consist of a theater with a flexible black box theater with occupancy of up to 283 and seating up to 150. It also includes a Lobby and additional support spaces. Bid Packages Available for Bidding: BP#12-Field Engineering; BP#13- Site Demolition; BP#14- Earthwork and Paving; BP#15- Site Utilities; BP#16- Fencing; BP#17- Landscaping; BP#18- Site and Building Concrete; BP#19- Metal Decking; BP#20- Millwork; BP#21- FRP; BP#22- Waterproofing; BP#23- Insulation and Firestopping; BP#24- UHPC Wall Panels; BP#25- Roofing; BP#26- Architectural Sheetmetal; BP#27- Fireproofing; BP#28- Doors and Hardware; BP#29- Overhead Doors; BP#30- Cement Plaster; BP#31- Metal Framing and Drywall; BP#32- Tile; BP#33- Acoustical Ceilings; BP#34- Stage Flooring; BP#35- Soft Flooring; BP#36- Fluid Applied Flooring; BP#37- Paint; BP#38- Signage; BP#39- Toilet Specialties; BP#40- Window Coverings; BP#41- Fixed Seating; BP#42- Final Cleaning. Bid Requirements This project requires prevailing wages be paid, pursuant to California Department of Industrial Relations Prevailing Wage Requirements. Certified Payroll will be required. Flint requires that all subcontractors have and maintain a valid and active California State Contractors license at the time of bid and throughout the duration of the project while under contract to perform their scope(s) of work. All subcontractors submitting bids on Public Works Projects must be registered with the California Department of Industrial Relations. Flint requires a Waiver of Subrogation from all successful subcontractors. Flint requires a completed prequalification questionnaire from all subcontractors prior to issuance of a subcontract. This information can be found in the Front End Bid Documents Flints Standard Form of Agreement (Subcontract) will be used for this project. Execution of Subcontract is required by all successful bidders. A copy of Flints Subcontract is available in the Front End Bid Documents. Bonding: N ot required for subcontractors who are prequalified with Flint. Submission of a bid or proposal to Flint represents an acknowledgement that the bidding entity has reviewed all of the bid documents, including addenda. Disadvantaged subcontractors and vendors certified by the State of California and/or US Federal Government are strongly encouraged to submit bids. This project includes a 3.0% DVBE goal for subcontractors and Material Suppliers. This project includes Skilled and Trained Work Force requirements per CA Public Contract Code. Flint is an Equal Opportunity Employer. We will consider all subcontractor and supplier bids regardless of race, sex, color, age, religion, gender, disability, ethnicity or national origin. Flint is signatory to the Carpenter Union. Direct all inquiries to the general contractor. Estimate = total project construction cost estimate. Addendum #1-#2 have been issued as of 2-21-2023. Addendum #2 description: Provide updates to the following bid packages based on RFI responses. Changes have been made in red . BP 20 – Millwork BP 23 – Insulation & Firestopping BP 31 – Metal Framing and Drywall BP 33 – Acoustical Ceilings Provides Supporting-Docs_V1 that appeared to have a loading issue. Provides responses to Pre-Bid RFI’s: |
||||||||||||||||||||||||||||||||||||||||
Details | 1 Story Above Grade, 28,000 SF.
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |