Similar Projects
Channel 1 Concrete Panel Replacement West of 66th Street
Post-Bid
Pinellas Park, FL 33781

Channel 5 Rip Rap Repairs Project
Post-Bid
Less than $100,000 est. value
Pinellas Park, FL 33781

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

Drainage Improvements for Third, Fourth, Fifth and Sixth Street BMP 3 and 4
Results
$328,559 est. value
Belleair Beach, FL 33786

Creek Shoreline Restoration
Post-Bid
Less than $600,000 est. value
Saint Petersburg, FL 33711

Drainage Improvements
Results
Less than $181,865 est. value
FL

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

Desilting and Video Inspection
Results
Less than $1,000,000 est. value

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Roosevelt Creek Channel 5 Improvements (PID 002123A)
Results
$2,235,933 est. value
Clearwater, FL 33756

Bridgeway Acres Class I Landfill Ditch Slope Rehabilitation (PID 000752B)
Post-Bid
Less than $1,600,993 est. value
FL

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

PPWMD Channel 1A2 Channel Improvements 49th Street North to 52nd Street North
Post-Bid
Pinellas Park, FL 33781

SPC Stem Center Living Shoreline
Results
Less than $100,000 est. value
Saint Petersburg, FL 33733

Hope Street Seawall Replacement
Post-Bid
$116,000 est. value
Tarpon Springs, FL 34689

Last Updated 12/06/2019 01:36 AM
Project Title

Palm Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Tarpon Springs, FL 34688   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $580,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all plant, labor, tools, equipment, materials, and performing all operations in connection with removal and construction of sanitary sewers and appurtenant structures, including excavation, trenching, backfilling and appurtenant work as required.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents