Similar Projects
Channel 5 Rip Rap Repairs Project
Post-Bid
Less than $100,000 est. value
Pinellas Park, FL 33781

Creek Shoreline Restoration
Post-Bid
Less than $600,000 est. value
Saint Petersburg, FL 33711

Pinellas Trail and 54th Avenue North Drainage Improvements (Pid # 000183A)
Results
$2,479,385 est. value
FL

Drainage Improvements for Third, Fourth, Fifth and Sixth Street BMP 3 and 4
Results
$328,559 est. value
Belleair Beach, FL 33786

Honeymoon Island State Park - Beach Nourishment
Post-Bid
$1,700,000 est. value
Dunedin, FL 34698

Palm Avenue Drainage Improvements
Results
Less than $580,000 est. value
Tarpon Springs, FL 34688

5440--Install Shoring for Repair Boiler Plant Column and Wall
Post-Bid
Bay Pines, FL 33744

Drainage Improvements
Results
Less than $181,865 est. value
FL

Bridgeway Acres Class I Landfill Ditch Slope Rehabilitation (PID 000752B)
Post-Bid
Less than $1,600,993 est. value
FL

Desilting and Video Inspection
Results
Less than $1,000,000 est. value

PPWMD Channel 1A2 Channel Improvements 49th Street North to 52nd Street North
Post-Bid
Pinellas Park, FL 33781

Roosevelt Creek Channel 5 Improvements (PID 002123A)
Results
$2,235,933 est. value
Clearwater, FL 33756

Hope Street Seawall Replacement
Post-Bid
$116,000 est. value
Tarpon Springs, FL 34689

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

SPC Stem Center Living Shoreline
Results
Less than $100,000 est. value
Saint Petersburg, FL 33733

Reported 05/09/2020 12:00 AM
Project Title

Channel 1 Concrete Panel Replacement West of 66th Street

Physical Address View project details and contacts
City, State (County) Pinellas Park, FL 33781   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by this section consists of furnishing all plant, equipment, labor and materials and performing all operations in connection with the installation of steel sheet piling to support the sloped concrete panels. This work includes, but is not limited to installation of driving templates, providing and driving steel sheet piling, disposal of excess steel sheet piling, quality assurance monitoring and vibration monitoring.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents