Similar Projects
Countywide Local Road Resurfacing FY 2021
Bidding
FL

2021 Street Resurfacing Project
Bidding
$650,000 est. value
Sanibel, FL

Improvements to Estero Boulevard Segment 5 and 6 Project
Post-Bid
Fort Myers, FL

First Street and Second Street Two Way Conversion
Post-Bid
Fort Myers, FL

Design of Unimproved Alleys
Results
Cape Coral, FL

Resurfacing of Del Prado Boulevard and Pondella Road 2020
Results
Fort Myers, FL 33901

Spot Paving FY2021
Post-Bid
Cape Coral, FL

Major Road Resurfacing FY20
Results
Cape Coral, FL 33915

Spot Paving Diplomat/Kismet FY20
Results
Cape Coral, FL 33909

Lehigh Local Road Resurfacing 2020B
Results
Fort Myers, FL 33901

Town Maintained Road Resurfacing
Results
$126,680 to $130,000 est. value
Fort Myers Beach, FL 33931

Countywide Arterials and Collectors Resurfacing 2020-A
Results
Fort Myers, FL 33901

Lee Boulevard and Lee Street Intersection Improvements
Results
Fort Myers, FL 33901

Spot Paving FY2020 - Various Locations
Results
Cape Coral, FL

Gateway Boulevard and Commerce Lakes Drive Intersection Improvements
Results
Fort Myers, FL 33913

Last Updated 07/09/2020 02:02 AM
Project Title

I-75 at Colonial Boulevard Interchange

Physical Address View project details and contacts
City, State (County) FL   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing I-75 bridges were previously widened with FPID: 411036-1 I-75 from S of Colonial Blvd to S of SR 82. This project’s as-builts are included in the reference information. Existing Bridges: Bridge No. 120121 - Over Colonial Boulevard NB Bridge No. 120120 - Over Colonial Boulevard SB The project reconstruction and widening limits are as follows: These project limits do not include Maintenance of Traffic (MOT), signing, ITS or other improvements necessary to support the construction of the project. 1.Colonial Boulevard; approximately ¼ mile west of Ortiz Avenue to approximately ¼ mile east of Dynasty Drive. (Sta 293+58.33 to Sta 378+79.66) 2.I-75 (NB & SB Sta 289+13.35 to Sta 343+78.35)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents