Similar Projects
Countywide Local Road Resurfacing FY 2021
Bidding
FL

2021 Street Resurfacing Project
Bidding
$650,000 est. value
Sanibel, FL

Improvements to Estero Boulevard Segment 5 and 6 Project
Post-Bid
Fort Myers, FL

First Street and Second Street Two Way Conversion
Post-Bid
Fort Myers, FL

I-75 at Colonial Boulevard Interchange
Results
FL

Resurfacing of Del Prado Boulevard and Pondella Road 2020
Results
Fort Myers, FL 33901

Spot Paving FY2021
Post-Bid
Cape Coral, FL

Major Road Resurfacing FY20
Results
Cape Coral, FL 33915

Spot Paving Diplomat/Kismet FY20
Results
Cape Coral, FL 33909

Lehigh Local Road Resurfacing 2020B
Results
Fort Myers, FL 33901

Town Maintained Road Resurfacing
Results
$126,680 to $130,000 est. value
Fort Myers Beach, FL 33931

Countywide Arterials and Collectors Resurfacing 2020-A
Results
Fort Myers, FL 33901

Lee Boulevard and Lee Street Intersection Improvements
Results
Fort Myers, FL 33901

Spot Paving FY2020 - Various Locations
Results
Cape Coral, FL

Gateway Boulevard and Commerce Lakes Drive Intersection Improvements
Results
Fort Myers, FL 33913

Last Updated 12/03/2019 03:33 PM
Project Title

Design of Unimproved Alleys

Physical Address View project details and contacts
City, State (County) Cape Coral, FL   (Lee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 09/23/19
Owner View project details and contacts
Architect View project details and contacts
Description

The design of the unimproved alley sections, (shown in red on the attached maps) shall incorporate adjoining paved alleys (shown in orange on the attached maps) as a continuous profile grade. Consultant shall design a profile for the entire length of alley (improved and unimproved) which minimizes ponding of water and promotes positive drainage towards the intersecting roadways. There are approximately 1.21 miles of unimproved alleys adjoining 2.32 miles of previously paved alleys.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents