Similar Projects
Callahan Country RV & Water Park
Renovation
Conception
Callahan, FL 32011

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
Palm City, FL 34990

Villa Pass
New Construction
Design
Mascotte, FL

Canal C-05 Diversion Structure and Offsite Pond Improvements
Infrastructure
Bidding
New Smyrna Beach, FL 32168

Downtown Watermain Replacement Phase IV
Infrastructure
Bidding
$1,487,100 est. value
Saint Petersburg, FL 33747

Cordova Palms - Site Only
New Construction
Post-Bid
Saint Augustine, FL

Construction Services for Project Improvements (Phase 3)
Post-Bid
FL

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Site Maintenance
Results
Newberry, FL 32669

Home Depot Site Work at Alton
New Construction
Construction
Palm Beach Gardens, FL 33418

The Lofts At Murray Hill - Site
New Construction
Construction
Jacksonville, FL 32205

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

NEFSH Water Main Extensions
Infrastructure
Bidding
$1,153,000 est. value
Macclenny, FL 32063

Construction Services For Epperson North District Improvements Pasco County
Post-Bid
Wesley Chapel, FL

Development of Vacant Lot on Dixie Highway - 2.29 Acres
Results
Lake Worth, FL 33460

Reported 01/14/2022 12:00 AM
Project Title

Master Pump Station 302.00 Site Improvements

Physical Address View project details and contacts
City, State (County) FL   (Collier County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,085,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Relocation of: existing water lines, low pressure, gas lines, telephone lines, electric lines, cable TV lines and storm drains as necessary Restoration of easements and right-of-ways

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications, Communications Services, Cable Services, Communications Backbone Cabling, Communications Copper Backbone Cabling, Communications Copper Cable Splicing and Terminations, Communications Connecting Cords, Devices, and Adapters, Communications Custom Cable Assemblies.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents