Similar Projects
Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

115th Street Mixed-Use
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Miami Shores, FL 33161

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Racetrack Water Tower Booster Pump Station
New Construction
Results
$750,000 est. value
Homestead, FL 33035

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Construction
$10,000,000 CJ est. value
Miami Beach, FL 33140

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Construction
$10,000,000 CJ est. value
Miami Beach, FL 33140

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

Electric Vehicle (Level 2) Charging Stations for Town Parking Locations
Infrastructure
Post-Bid
$40,000 CJ est. value
Bay Harbor Islands, FL 33154

Roadway Resurfacing-Multiple Sites
Infrastructure
Results
$3,026,487 est. value
FL

Last Updated 06/07/2023 01:41 PM
Project Title

Pump Station 3 Force Main Replacement

Physical Address View project details and contacts
City, State (County) Coral Gables, FL 33145   (Miami-Dade County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,349,930 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

A non-mandatory Site Visit will be conducted at 803 S. Greenway Dr. (Northeast Corner of Intersection of Coral Way and S. Greenway Dr.) on May 2, 2023, at 10:30 a.m. A non-mandatory Site Visit will be conducted at 803 S. Greenway Dr. (Northeast Corner of Intersection of Coral Way and S. Greenway Dr.) on May 2, 2023, at 10:30 a.m. Furnishing all labor, materials, equipment and incidentals required for cleaning and testing the sewage force mains

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents