Similar Projects
NE 153 Street Roadway and Drainage Improvements
Infrastructure
Bidding
North Miami Beach, FL 33162

Intersection Improvements to Old Cutler Road at SW 136 Street and SW 67 Avenue
Infrastructure
Bidding
$2,294,031 est. value
Cutler Ridge, Miami, FL 33190

Improvements to Downtown Mobility
Post-Bid
Less than $1,042,751 est. value
Miami, FL 33129

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Roadway Resurfacing-Multiple Sites
Results
Less than $2,456,426 est. value
Miami, FL 33128

Asphalt Repair
Infrastructure
Bidding
$15,000,000 est. value
FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Asphalt Paving, Resurfacing and Drainage
Term Contract
Results
Miami, FL 33144

One Year WASD Pavement Restoration Project A
Infrastructure
Bidding
$1,742,580 est. value
FL

Construction Services for a Roadway Improvement
Post-Bid
Miami Shores, FL 33150

Push Button Intersection Improvements-South
Results
Less than $2,379,472 est. value
FL

Milling and Resurfacing/Base Work/Roadway Signing/Drainage Improvements - SR 112 (I-195) (Julia Tuttle Cswy) and SR 907 (Alton Rd)
Infrastructure
Bidding
$11,318,449 est. value
FL

Push Button Intersection Improvements-North
Post-Bid
$1,583,934 est. value
FL

Roadway Improvements to NW 58 Street from NW 97 Avenue to NW 79 Avenue
Results
Less than $12,305,266 est. value
Miami, FL 33128

Last Updated 04/25/2022 01:08 PM
Project Title

Design-Build Services for Roadway Improvements to NE 2nd Avenue

Physical Address View project details and contacts
City, State (County) Miami, FL 33128   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $10,307,626
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Require design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street. Goal: 25% SBE - A/E goal 5.43% SBE - Construction goal 0.63% - SBE 10% - Community Work Force Program (CWP) Goal The estimate Design-Build project cost is $10,307,626.00, which includes the following: Estimated Construction Cost: $8,455,348.00 Estimated Design Cost: $782,091.00 Contingency Fees for Construction (10%): $845,535.00 Permitting Fees: $50,220.00

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents