Similar Projects
Ramp Improvements
Infrastructure
Bidding
$336,000 est. value
FL

NE 153 Street Roadway and Drainage Improvements
Infrastructure
Bidding
North Miami Beach, FL 33162

Improvements to Downtown Mobility
Post-Bid
Less than $1,042,751 est. value
Miami, FL 33129

Traffic Circle Improvements at SW 97 Avenue and SW 120 Street
Post-Bid
Less than $401,933 est. value
Miami, FL 33128

VCA/ADA Accessibility Improvements to Common Areas and Parking Spaces - 30 West 33rd / 35 West 32nd Street
Results
Hialeah, FL 33010

North Cruise Boulevard Extension Phase III
Results
Less than $11,834,424 est. value
Miami, FL

Public Beach Access Improvements
Infrastructure
Bidding
Key Biscayne, FL 33149

Safe Route to Schools Locations Phase 22 FM 439895-1
Post-Bid
Less than $171,530 est. value
Hialeah, Miami Gardens, Opa-locka, FL 33014

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

Cargo Yard Drainage Improvements Phase 1
Infrastructure
Bidding
$1,481,600 est. value
Miami Beach, FL 33139

Safe Route to Schools Locations Phase 21 FM 439894-1
Post-Bid
Less than $382,771 est. value
Miami, FL 33144

Construction of New Pedestrian Pathway at Fuchs Park
Results
Miami, FL 33143

SR 972/SW 13th ST/SW 3rd Avene/Coral Way - Roundabout Construction
Infrastructure
Bidding
$2,766,178 est. value
FL

Roadway Improvements to SW 22 Avenue from US-1 to Coral Way
Post-Bid
$559,425 est. value
Miami, FL 33010

Roadway Resurfacing-Multiple Sites
Results
Less than $2,456,426 est. value
Miami, FL 33128

Reported 05/05/2022 12:00 AM
Project Title

Intersection Improvements to Old Cutler Road at SW 136 Street and SW 67 Avenue

Physical Address View project details and contacts
City, State (County) Cutler Ridge, Miami, FL 33190   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,294,031
Plans Available from County Agency - 03/10/22
Owner View project details and contacts
Architect View project details and contacts
Description

Small Business Enterprise SBE-CONST. Measure: 11.57% SBE-GS Goal: 1.89% Work includes but is not limited to the following: Roadway improvements for the reconstruction of the existing Old Cutler Road intersections at SW 136 St and at SW 67 Ave. The project proposes to install a 4-lane roundabout at each of these intersections, which includes roadway improvements along all approaches, as well as providing continuity and connection to the existing shared-use path. The improvements are comprised of roadway reconstruction, new sidewalks, shared-use path, curbs and gutters, stormwater drainage system, street lighting, landscaping, signalization removal, pavement markings and signage.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents