Similar Projects
Fort Wayne Campus Visual Arts Building Roof Repair and Replacement 2021
Alteration
Bidding
IN 46815

Noblesville City Hall Roof Replacement
Alteration
Bidding
Noblesville, IN

New Albany Roof and Cooling Tower
Post-Bid
$1,000,000 to $5,000,000 est. value
New Albany, IN 47150

LBNM Replace Maintenance Building Roof
Post-Bid
Lincoln City, IN 47552

Furniture Shop Re-Roof
Results
Pendleton, IN 46064

Main Office Roof Replacement & Rehabilitation
Results
Terre Haute, IN 47804

Residential Energy Conservation Services
Renovation, Infrastructure
Bidding

Architectural And Engineering Design Services
Term Contract
Post-Bid
Bloomington, IN 47403

BL580 Indiana Institute on Disability and Community Roof Replacement
Results
Bloomington, IN 47408

LOI- Seeking Qualified Contractors for Various Services
Term Contract
Post-Bid
Marion, IN 46953

Bl414 Myles Brand Hall Metal Roof Replacement
Results
Bloomington, IN 47408

South Aeration Gallery Roof Replacement
Post-Bid
Gary, IN 46402

ES Roof Repair
Results
Hobart, Lake Station, IN 46342

Integetated Roof Maintenance Services
Term Contract
Post-Bid
Indianapolis, IN 46204

FMS 10 Roofing Replacement
Results
Fort Wayne, IN 46825

Reported 08/11/2021 12:00 AM
Project Title

Replace the EPDM Roof Membrane

Physical Address View project details and contacts
City, State (County) Francesville, IN   (Pulaski County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Remove existing EPDM membrane roof from the entire perimeter of the building. 2. Inspect existing insulation and remove/replace any wet or damaged areas. 3. Lift bottom course of metal shingles for installation of new membrane roofing to be installed. 4. Install a new 1/4” primed cover board over existing insulation. 5. Adhere new FiberTite (or equal) membrane roofing over the cover board. 6. Terminate the flashings and heat weld seams to ensure a water tight seal on the roof. 7. Fabricate and install a slip metal to go under the first course of metal shingles around the entire perimeter of the roof area. 8. Remove and dispose of all waste and debris associated with work on a daily basis. Removal from the site shall be at contractor’s expense. 9. New roofing material shall have a minimum 20 year manufacturer’s warranty and one year labor warranty. 10. Patch metal shingle roof in 2 area where HVAC vent stacks were re- moved from roof. 11. Replace existing exposed/rusted fasteners as needed on ridges in metal shingle roof. (Approximately 20)

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents