Similar Projects
Addition and Renovation, Brighton Area Fire Authority, Fire Station 34
Renovation, Addition
Post-Bid
Brighton, MI

Washington Township Fire Station 3
Post-Bid
Less than $4,200,950 est. value
Washington Township, MI 48094

Design Build of New Fire Stations 1 and 2
New Construction - 37,000 SF
Results
Highland, MI

Police Station Shower/Locker Room Renovation
Renovation
Results
Brighton, MI

Bid Package 2 - GC Bid for New Fire Station No. 2
New Construction - 18,324 SF
Construction
Portage, MI

Jerome Township Fire Station 1
New Construction
Construction
Sanford, MI

Branch County Jail and Sheriff`s Facility BP4
Post-Bid
Coldwater, MI

Fire Station 1 Renovations
Renovation
Results
New Baltimore, MI 48051

Grayling Airfield-Construct Fire Station Addition
Addition
Construction
Grayling, MI 49739

Branch County Jail & Sheriff`s Facility Final Package
Addition - 56,500 SF
Post-Bid
Coldwater, MI

Redevelop - Former Firehouse
Results
Romulus, MI

New Station No. 1- General Trades
Post-Bid
Whitehall, MI 49461

Design Build Police Building Addition
Addition
Results
Less than $394,000 est. value
Caro, MI

Isabella Country Jail And Sheriffs Office
Post-Bid
Mount Pleasant, MI

Phase IV Police Department Renovations - Dispatch
Renovation
Results
Dearborn, MI

Reported 09/15/2020 12:00 AM
Project Title

Police Dispatch Renovation 2020

Physical Address View project details and contacts
City, State (County) Peshawbestown, MI   (Leelanau County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Renovation and new construction work for the GTB Police Dispatch area including (but not limited to) demolition, general construction, finishes, HVAC/plumbing work, electrical work, and FF&E installation for a complete job.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents