Similar Projects
Miro Corners Parking
New Construction
Conception
$665,468 est. value
Hollywood, FL 33314

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Southeast 5th Avenue Crosswalk
Bidding
$50,000 est. value
Dania Beach, FL

Widen/Resurface Exist Lanes/Sidewalk/Bicycle Lanes
Post-Bid
Less than $1,378,994 est. value
FL

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

Sidewalk Restoration Services
Term Contract
Results
Miramar, FL

WPB Callaway Resurface POV Parking
Results
West Palm Beach, FL 33406

Off Street Sustainable Surface Parking Facility
Bidding
$450,000 est. value
Hallandale, FL

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Asphalt Repairs and Sidewalk Replacement Services
Bidding
Wilton Manors, FL

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

Broward MPO Regional Complete Streets Initiative
Results
FL

Bike Lane/Sidewalk
Bidding
$14,372,672 est. value
FL

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Last Updated 04/19/2021 11:13 PM
Project Title

Safety D/B Push Button for WWD Devices at Interstate Ramps

Physical Address View project details and contacts
City, State (County) (Broward, Palm Beach Counties)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Task Work Order driven Districtwide Design-Build PushButton Contract. The Task Work Orders derived from this contract may contain Federal Highway Administration (FHWA) mandates that require Federal Highway Administration approval as well as State mandates that require State approval. The successful bidder will be responsible for the implementation of at least 3 Task Work Orders covering Locations 1, 2 and 3 from concept to completion of construction. Typical Task Work Order will consist of: Signing and pavement marking of wrong way vehicle and advanced countermeasure installation of detection method including but not limited to intelligent transportation systems (ITS) for limited access facility at exit ramp interchanges. Locations: I-75 N & SR-822 (Sheridan Street) (Exit 11A) I-75 S & SR-822 (Sheridan Street) (Exit 11) I-95 S & SR-708 (W. Blue Heron Boulevard) (Exit 76)

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents