Similar Projects
Safety D/B Push Button for WWD Devices at Interstate Ramps
Bidding

Street Resurfacing and Miscellaneous Roadway Improvements
Term Contract
Bidding
$650,000 est. value
Jupiter, FL

Construct North 7th Street Sidewalk
Term Contract
Post-Bid
Lantana, FL 33462

Park Asphalt Overlay and New Parking at John Stretch Memorial Park, Haverhill Park and Glades Pioneer Park
Post-Bid
Haverhill, FL 33415

Broadway and Blue Heron Block Redevelopment Project
Results
Riviera Beach, FL 33404

Parking Lot Seal Coating at Jupiter Community Park
Results
Jupiter, FL 33458

Public Works Annual Pathways and Minor Construction
Term Contract
Bidding
Wellington, FL

Dixie Manor Apartments Sidewalk Replacement Project
Post-Bid
Boca Raton, FL 33432

Bike Lane/Sidewalk/Pedestrian Detectors
Results
Less than $304,785 est. value
FL

Pelican Preserve Nature Walk Repair Project
Post-Bid
Palm Beach Gardens, FL

Asphalt Sidewalk/Fencing
Results
Less than $304,597 est. value
FL

Phase I of Replacement and Installation of Sidewalks
Post-Bid
Pahokee, FL

Glades Road Library - Parking Lot Maintenenace
Term Contract
Results
Less than $225,000 est. value
West Palm Beach, FL 33434

Asphalt Sidewalk and Driveway
Post-Bid
West Palm Beach, FL

Underground Contractor Services
Term Contract
Results
Highland Beach, FL 33487

Last Updated 01/29/2020 09:47 AM
Project Title

WPB Callaway Resurface POV Parking

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL 33406   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Resurface approximately 95,530 square feet asphalt parking lot, 20+ years old with cracks, potholes and tree root issues that are causing the asphalt to fail. Scope of Work: 1. Removal and disposal of existing wheel stops. 2. Survey the existing trees in the parking lot areas to determine type and assess their condition. Also, include tree root pruning to address the roots. 3. Removal of asphalt and landscaping. 4. Installation of new islands and Type D Curbs. 5. Replacing existing handicap ramps to current ADA compliance. 6. Rework base and grade as required to ensure proper drainage to swales. 7. Installation of a new parking lot lighting system, to meet local permitting agencies code requirements. 8. Resurface with SP 9.5 TLC asphalt approx. 2.00" and speed bumps. 9. Installation of new wheel stops, pavement markings and signs. 10. Update and replace existing landscaping based on current condition, impact by the new work and to meet local permitting agencies code requirements. 11. After paving operation is complete, clean all drainage pipes to insure proper drainage to ponds. 12. Clean repair area of vegetation, dirt and surface debris as required.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents