Cubesmart and Fire Station
New Construction, Build-Out - 97,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Oakland Park, FL 33334

New City Hall Complex & Westside Fire Station No. 2
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Orlando Fire Station 6
New Construction
Design
Orlando, FL

SWFD Station Design
Design
Miramar Beach, FL 32550

Fire Rescue Station #14
New Construction - 12,855 SF
Bidding
$5,300,000 est. value
Stuart, FL 34996

Fire Rescue Station 18
New Construction - 12,855 SF
Bidding
$4,800,000 est. value
Stuart, FL 34994

Kathleen Fire Rescue Station
New Construction - 11,487 SF
Post-Bid
Less than $3,600,000 est. value
Bartow, Lakeland, FL 33810

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Groveland Police and Fire Building - New Public Safety Complex
New Construction - 33,490 SF
Results
Groveland, FL 34736

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Fire Station 10
Construction
Port Charlotte, FL 33948

Newfield - Master Plan
New Construction - 296,000 SF
Design
$10,000,000 CJ est. value
FL 34990

New City Hall and Commission Chamber and Police Department and Emergency Operations Center
New Construction, Renovation - 48,410 SF
Bidding
Lynn Haven, FL 32444

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Reported 12/11/2019 10:50 AM
Project Title

Construction of a New Fire Station Number 1 Facility

Physical Address View project details and contacts
City, State (County) Miami Beach, FL   (Miami-Dade County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $6,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction Management at Risk (CMR) shall provide comprehensive construction management services during the design through construction close-out phases, as set forth more fully in the Statement of Work Required set forth in Appendix C of this RFQ, including, but not limited to: i. Developing and monitoring the Project schedule and budget to ensure Project implementation needs are met; ii. Conducting design reviews and providing value engineering services, with recommendations to the Design Professional, regarding construction feasibility, selection of potential site, selection of materials, systems, equipment, pricing and scheduling; iii. Establishing an agreed-upon Guaranteed Maximum Price (GMP) which must be consistent with City’s budget and Project design requirements, and for which the Construction Management (CM) shall be “at risk” for delivery of all work required for completion of the Project in accordance with the Project schedule; iv. Providing cost estimating during design and construction; v. Maintaining a system of cost control;' vi. Coordinating the letting and award of multiple bid packages for subcontractor trades, and coordinating the work of all contractors performing work on the Project; vii. Providing compliance services with respect to contract activities, including enforcement of prevailing wage requirements; viii. Evaluating design resolutions as related to schedule and budget; ix. Providing full-time construction supervision services, including scheduling, conducting progress meetings and preparing minutes and other reports with respect to the progress of the Project; x. Coordinating site construction management services including, but not limited to, regular job site meetings, maintaining daily on-site project log and schedule report, overseeing quality assurance, testing and inspection programs, monitoring construction management staff and sub-contractor work performance for deficiencies, maintaining record copies of all contract documents, change orders and other documentation on site, overseeing construction management staff and subcontractor safety programs; xi. Updating and maintaining master project schedules, detailed construction schedules, submittal schedules, and inspection schedules; xii. Assembling and timely submitting to the City all maintenance and operations manuals, warranty documents and “as-builts”; and providing construction management services during warranty period; xiii. Submitting exception-based status reports, associated with the Best Value Quality Control Plan, addressing conditions, situations, and events that introduce risk to the project, in terms of cost, schedule, quality, and City’s expectations, and including the CMR’s plan to mitigate the risk(s); xiv. Coordinating with the Design Professional and City representative(s) the substantial and final inspections, prior to the Design Professional approval and issuance of the Certificate of Substantial Completion.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents