Similar Projects
Douglas Bldg. ADA Upgrades- Parking
Post-Bid
Tallahassee, FL 32399

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Polk Drive Sidewalk Improvements, Phase 2
Term Contract
Results
Less than $674,806 est. value
Tallahassee, FL 32301

Paul Russell Road - Exterior Entryway Project
Results
Tallahassee, FL

Rotenberger Viewing Platform
Term Contract, Infrastructure
Post-Bid
$200,000 est. value
Tallahassee, FL

Resurfacing
Results
Less than $9,268,911 est. value
FL

Welaunee Boulevard Segment 3A and Segment 2 Turn Lanes Construction Project
Results
Tallahassee, FL 32308

Safety Project/Add Turn Lanes/Traffic Signals/Drainage Improvements
Results
Less than $265,041 est. value

Welaunee Boulevard Segment 3B Construction Project
Results
Tallahassee, FL 32308

Miscellaneous Public Infrastructure Engineering Projects
Results
Less than $168,000 est. value
Tallahassee, FL 32301

Sidewalk Construction/Rehabilitation
Results
Tallahassee, FL 32301

Asphalt Milling and In Place Asphalt Services
Results
Tallahassee, FL 32301

Blountstown Sidewalk Improvements
Results
Tallahassee, FL 32301

Roadway Repair
Results
Less than $2,220,196 est. value
Tallahassee, FL

Hot Plant Mix
Results
Less than $4,483,392 est. value
FL

Last Updated 08/26/2021 04:04 PM
Project Title

6th Avenue Pedestrian and Roadway Modifications

Physical Address View project details and contacts
City, State (County) Tallahassee, FL 32303   (Leon County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work on this project consists of furnishing all labor, equipment and materials for the construction of a new concretes curb and gutter, stand alone curbed islands, mid-block crossing, pavement markings and ADA ramp reconstruction along 6th Avenue between Gadsden Street and Marion Avenue. The project includes demolition, sidewalk and driveway construction, pavement markings, signage, minor drainage structure adjustments, sodding and planting of landscape materials.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents