Similar Projects
Rickenbacker Industrial Building I & II
New Construction - 5,700,000 SF
Conception
Lockbourne, OH 43137

Scrap Metal Facility
New Construction - 39,754 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Euclid, OH 44117

Self-Storage Facility
New Construction, Demolition - 203,000 SF
Design
Mayfield Heights, OH 44124

Taylor Road Commercial Park
New Construction - 260,800 SF
Design
$6,600,000 est. value
Gahanna, OH 43004

50 X 50 Pre-Engineered Steel, Cold Storage Building
Post-Bid
Sulphur Springs, OH

Blair Lofts - Phase I
New Construction - 52,596 SF
Post-Bid
$9,000,000 est. value
Cincinnati, OH 45229

Energy Conservation and Facility Infrastructure Improvement Project
Renovation - 408,664 SF
Results
Toledo, OH 43604

Lucas County Board of Developmental Disabilities Maintenance Building Addition
Addition - 9,600 SF
Results
Less than $1,100,000 est. value
Toledo, OH 43614

The Cubes at Etna West - Phase I
New Construction - 5,435,000 SF
Construction
$10,000,000 CJ est. value
Etna, OH 43018

U-Haul Moving & Storage of Northland
Renovation - 101,052 SF
Construction
$2,000,000 est. value
Columbus, OH 43229

Warehouse Renovation
Renovation - 381,740 SF
Pending Verification
Parma, OH 44130

2J Supply Headquarters Relocation
New Construction - 54,000 SF
Pending Verification
$6,000,000 est. value
Dayton, OH 45404

The Motor Enclave
New Construction - 188,615 SF
Conception
$30,000,000 est. value
New Albany, OH 43054

Poste - Phase II
New Construction, Renovation - 65,563 SF
Design
$10,000,000 est. value
Cincinnati, OH 45206

Dover Township Office and Equipment Storage Building
Post-Bid
Less than $375,500 est. value
Millfield, OH 45761

Last Updated 07/01/2021 12:37 PM
Project Title

2021 30K Spec Building

Physical Address View project details and contacts
City, State (County) Heath, OH   (Licking County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

One story, slab-on-grade pre-engineered steel framed building with concrete block and metal siding.

Details

Warehouse/Storage, New Construction, 1 Warehouse/Storage, 30,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents