Similar Projects
Bond Hill Senior
New Construction - 40,245 SF
Conception
$13,069,910 est. value
Cincinnati, OH 45237

"The Node" Mixed-Use Development
New Construction - 305,060 SF
Conception
$10,000,000 CJ est. value
Cincinnati, OH 45220

LPH Thrives - Apartment Building
Renovation - 48,138 SF
Design
$8,400,000 to $12,685,463 est. value
Cincinnati, OH 45204

Former U.S. Playing Card Site Redevelopment
New Construction, Demolition
Design
$100,000,000 est. value
Norwood, OH 45212

Statewide Boat Storage Facilities
New Construction
Bidding
$2,900,000 est. value
Logan, Millersport, Mogadore, Ravenna, OH

OTR – Liberty & Elm aka Freeport Row at Liberty and Elm
New Construction, Renovation - 302,232 SF
Sub-Bidding
$10,000,000 CJ est. value
Cincinnati, OH

The Pinecrest Apartments
Renovation - 131,928 SF
Post-Bid
$13,900,000 est. value
Cincinnati, OH 45205

Springfield Township Community Center Improvements, the Grove Improvements, and New Stage With Public Restrooms
Post-Bid
Cincinnati, OH

Demolition and Site Restoration of 106 and 108 Winkler Street
Demolition - 3,500 SF
Results
Cincinnati, OH 45202

Peters Cartridge Factory
Renovation
Construction
$23,000,000 est. value
Cincinnati, OH 45208

Paramount Square
Renovation - 36,000 SF
Construction
$20,000,000 est. value
Cincinnati, OH 45206

Victory Parkway Apartments
Renovation - 40,000 SF
Pending Verification
$3,000,000 est. value
Cincinnati, OH 45206

Pleasant Street - Multi Family Development
Renovation
Pending Verification
Cincinnati, OH 45202

Wegman Building Redevelopment
Renovation - 60,000 SF
Conception
Cincinnati, OH 45202

Mulberry Street Townhomes
New Construction - 6,880 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Cincinnati, OH 45202

Reported 02/19/2021 03:55 PM
Project Title

Blair Lofts - Phase I

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45229   (Hamilton County)
Category(s) Commercial, Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Fitness Center, Warehouse/Storage
Contracting Method General Contractor to Subcontract.
Project Status Sub-Bidding, Construction Start Expected April 2021, Construction Completion Expected April 2022
Bids Due View project details and contacts
Estimated Value $9,000,000
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Fitness Center, New Construction, 1 Apartments/Condominiums, 4 Stories Above Grade, Approximately 52,596 SF New Construction 64 Unit(s), Clubhouse/Social Club, New Construction, Warehouse/Storage, New Construction, 74 Parking Spaces, 2.50 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Residential Equipment, Residential Appliances, Athletic Equipment, Exercise Equipment.
Division 12 - Furnishings, Rugs and Mats.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents