Similar Projects
"The Node" Mixed-Use Development
New Construction - 305,060 SF
Conception
$10,000,000 CJ est. value
Cincinnati, OH 45220

"The Node" Mixed-Use Development
New Construction - 305,060 SF
Conception
$10,000,000 CJ est. value
Cincinnati, OH 45220

Stone Ridge Landing
New Construction - 51,768 SF
Design
$15,102,098 est. value
Cincinnati, OH 45225

Bigelow Street Apartments
New Construction, Renovation - 162,630 SF
Design
$40,000,000 est. value
Cincinnati, OH 45219

Starbucks
New Construction - 2,225 SF
Sub-Bidding
Harrison, OH 45030

Springdale Apartments
New Construction - 6,130 SF
Sub-Bidding
$32,000,000 to $40,600,000 est. value
Cincinnati, OH 45246

Blair Lofts - Phase I
New Construction - 52,596 SF
Post-Bid
$9,000,000 est. value
Cincinnati, OH 45229

Blair Lofts - Phase I
New Construction - 52,596 SF
Post-Bid
$9,000,000 est. value
Cincinnati, OH 45229

The Pinecrest Apartments
Renovation - 131,928 SF
Results
$13,900,000 est. value
Cincinnati, OH 45205

UC Eden Avenue & Corry Street 2020 Garage Repairs
Results
Cincinnati, OH 45221

Peters Cartridge Factory
Renovation
Construction
$23,000,000 est. value
Cincinnati, OH 45208

Anthem - East Walnut Hills Residential Development
New Construction - 820,444 SF
Construction
$55,000,000 est. value
Cincinnati, OH 45206

Pleasant Street - Multi Family Development
Renovation
Pending Verification
Cincinnati, OH 45202

Lunken Airport Terminal Redevelopment
Renovation - 50,000 SF
Pending Verification
Cincinnati, OH 45226

Blue Ocean Mixed-Use Building
New Construction - 2,000 SF
Conception
$500,000 to $1,000,000 CJ est. value
Cincinnati, OH 45202

Last Updated 10/28/2021 08:58 AM
Project Title

Factory 52 - Phase I

Physical Address View project details and contacts
City, State (County) Norwood, OH 45212   (Hamilton County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Food/Beverage Service, Parking Garage, Warehouse/Storage
Contracting Method
Project Status Construction Commenced September 2021, Construction Completion Expected second quarter 2023
Bids Due View project details and contacts
Estimated Value $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 is to include construction of apartments, redevelopment of a historical clock tower, two parking garages, green and park space, a brewery, food hall and infrastructure improvements.

Details

1 Warehouse/Storage, Demolition, 1 Apartments/Condominiums, New Construction 271 Unit(s), 2 Parking Garage, New Construction, Food/Beverage Service, New Construction, 20.39 Acres.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation, Demolition, Structure Demolition, Building Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Hospitality Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Selective Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents